Laserfiche WebLink
F. In -Tank Gauging /SIR Equipment: r Check this box if tank gauging is used only forme 8VEL) <br />r Check this box if no tank gauging or SIR equi rye Ile .This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring.�,i�11 <br />Complete the following checklist: <br />MAY 21 2015 <br />(` Yes <br />r No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />FM <br />r Yes <br />r No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />r Yes <br />r No* <br />Was accuracy of system product level readings tested? <br />C Yes <br />r No* <br />Was accuracy of system water level readings tested? <br />r Yes <br />r No* <br />Were all probes reinstalled properly? <br />K- Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following checklist: <br />rt Yes <br />No* <br />For equipment start-up or annual equipment certifications was a leak simulated to verify LLD performance? (Check all that <br />apply) Simulated leak rater 3 g.p.h.; r 0.1 g.p.h; 1 0.2 g.p.h. <br />N/A <br />Yes <br />r No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />+ Yes <br />r NO <br />Was the testing apparatus properly calibrated? <br />r Yes <br />r No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />(9 N/A <br />r Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />r N/A <br />C: Yes <br />r No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />r N/A <br />monitoring system is disabled or disconnected? <br />+ Yes <br />(_ No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />r N/A <br />monitoring system malfunctions or fails a test? <br />% Yes <br />r No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />r N/A <br />• Yesr <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 12/07 <br />ENTAL. <br />)TqACA1T <br />