Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: r Check this box if tank gauging is used o,51114rgLyentory control. <br />r Check this box if no tank gauging or SI"iffMIVEL, <br />This section must be completed If in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />MAY 01 2nm <br />> "' Yes <br />r No* <br />Has all input wiring been inspected for proper entry and termination, including testing for grouy <br />Numits? <br />f` Yes <br />r No* <br />Nere all tank gauging probes visually inspected for damage and residue buildup? <br />C Yes <br />r No* <br />Nas accuracy of system product level readings tested? NFAFTwinicom,74, <br />Yes <br />r No* <br />Nas accuracy of system water level readings tested? <br />Yes <br />r No* <br />Nere all probes reinstalled properly? <br />+s Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />C No* <br />For equipment start-up or annual equipment certificationwasa leak simulated to verify LLD performance? (Check all that <br />apply) Simulated leak rater 3 g.p.h.; r 0.1 g.p.h; t 0.2 g.p.h. <br />N/A <br />C Yes <br />• No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />f: Yes <br />r No* <br />Was the testing apparatus properly calibrated? <br />C Yes <br />f No* <br />For mechanical LLDs, does the LLD restrict product Flow if it detects a leak? <br />G N/A <br />l: Yes <br />C No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />C N/A <br />Yes <br />C No- <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />C N/A <br />monitoring system is disabled or disconnected? <br />fi Yes <br />C No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />C N/A <br />onitoring system malfunctions or fails a test? <br />G Yes <br />C No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />C N/A <br />is Yes <br />C No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />die I.d. failed <br />Page 3 of 4 12/07 <br />AL <br />IT <br />