Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 1 of 1 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes r <br />Spill/Overfill Containment Boxes are Present, but were Not Tested r <br />Test Method Developed By: r.7 Spill Bucket Manufacturer C✓ Industry Standard r Professional Engineer <br />F Other (Specify): <br />Test Method Used By: F Pressure r Vacuum W Hydrostatic <br />F. Other (Specify): <br />Tcst I;quipmcnt Used: VACUUM TEST Equipment Rcsolution: 0.1 gph <br />Spill Box # Tank TI <br />UNLEADED -Fill I - <br />Direct - Grade level in <br />containment sump <br />Spill Box # Tank T-2 <br />PREMIUM - Fill I - <br />Direct - Grade level in <br />containment sump <br />Spill Box # Tank T-3 <br />Diesel - Fill l - Direct - <br />Grade level in <br />containment sump <br />Spill Box # <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />12.50 <br />12.50 <br />12.50 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />min <br />Test Start Time: <br />09:51:00 <br />09:54:00 <br />10:10:00 <br />Initial Reading (RI): <br />30.00 in. H2O <br />30.00 in. H2O <br />30.00 in. H2O <br />Test End Time: <br />09:52:00 <br />09:55:00 <br />10:11:00 <br />Final Reading (RF): <br />30.00 in. H2O <br />29.80 in. H2O <br />29.80 in. H2O <br />Test Duration: <br />1 min <br />1 min <br />I min <br />(RF -RI): <br />0.00 in. H2O <br />-0.20 in. H2O <br />-0.20 in. H2O <br />Pass/Fail Threshold or Criteria: <br />+/-4.00 <br />+/-4.00 <br />+/-4.00 <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2316672 <br />