Laserfiche WebLink
Chevron Monitoring Certification Checklist <br />Store Number: 307709 I Address: 10858 TRINITY PKWY STOCKTON, CA 95219 APR 11 2016 <br />Date: 3/31/2016 1 Technician: Jarrod Cooke <br />Company: TANKNOLOGY INC. <br />Step <br />Instruction <br />Tank 1- UNLEADED <br />Tank 2 - PREMIUM <br />Tank 3 - Diesel <br />8' diameter <br />1 1/2 Circum =151" <br />Product <br />UNLEADED <br />PREMIUM <br />Diesel <br />Tank Type <br />(DW FRP, DW Steel, SW FRP) <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />1 <br />Annular Riser Height (measured) <br />2 <br />Tank Diameter <br />118.00 in. <br />118.00 in. <br />119.50 in. <br />For FRP tanks, 1/2 circumference of the tank <br />3 <br />(see Note 1 below) <br />185.26 n <br />185.26 in. <br />187.62 in. <br />Required annular sensor length: <br />4 <br />FRP = Riser+ 1/2 Circumference = step 1 +step 3 <br />185.26 in. <br />185.26 in. <br />187.62 in. <br />Steel = Riser + diameter= step 1 +step 2 <br />Mark & label the required sensor length on sensor cord. <br />5 <br />Label should be under the cap & serve to prevent the cord <br />being pulled too short. <br />FRP Tanks: Is the sensor installed with the marked <br />6 <br />required <br />length lining up with the top of the annular riser? <br />Steel Tanks: Is the sensor toughing bottom with slack <br />7 <br />above the marked required sensor length? <br />Are the DW pipe boots pulled back in tank sumps? <br />8 <br />(YIN or N/A, note if can't be verified because clamshell <br />pointing down <br />Are tank sump sensors back in their holders and in the <br />9 <br />correct position? <br />Yes <br />Yes <br />Yes <br />(YIN or N/A document with photo) <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />(If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br />Replaced Today <br />Has Veeder Root Programming before & after testing been printed & verified? <br />(especially tank manifolding setup - see Note 2) <br />Yes <br />Has Veeder Root Programming before & after been attached to the Work Order? <br />Yes <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels <br />Yes <br />Additional Comments: <br />brine annulars/vph system <br />Note 1: <br />DW FRP Tank Circumference <br />1/2 Circum = <br />(3.14 x tank diam) <br />2 <br />10' diameter <br />1/2 Circum =188" <br />8' diameter <br />1 1/2 Circum =151" <br />6' diameter <br />1/2 Circum = 113" <br />Note 2: Certain Veeder Root Software versions will automatically revert to the default <br />tank manifold settings any time the programming is changed, such as when sensors are <br />temporarily Vied out, etc. <br />