Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />` In Section E below, describe now and when mese aewcwfikwws W -M Ol — <br />E. Comments: Cold Started Veeder Root and returned to complete Monitor Certification on all sensors. Tested PLLD's and <br />found all passed. Pull all brine, pan, and sump sensors. Confirmed audible, visual, and positive shutdown. Tested positive shut <br />down and sensor out. Tested overfill and high product. Tested vacuum for high liquid and no vac. <br />Monitoring System Certification Page 2 of 4 <br />12107 <br />2 2/21/07 <br />Is the audible alarm operational? <br />Is the visual alarm operational? <br />FYesO <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />ro er o eration? <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />Yes <br />® NIA <br />No' <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />If sensors initiate positive shut -down? (Check all that apply) <br />❑ WA <br />detects a leak, fails to operate, or is electrically disconnected? yes: which <br />® SumpfTrench Sensors; ® Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? ® Yes; ❑ No. L1, 4, 6, 7, <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />Yes <br />El No* <br />® <br />❑ N/A <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />tank capacity does the alarm trigger? 90°6 <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br />® No <br />manufacturer name and model for all re lacement arts in Section E below. <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check a!1 that apply) ❑Product; ❑Water. <br />41ZYeof <br />® No <br />If es, describe causes in Section E, below.❑ <br />monitoring system set-up reviewed to ensure proper settings? Attach setup reports,rf applicable <br />No`Was <br />No` <br />Is all monitoring equipment operational per manufacturer's specifications? <br />` In Section E below, describe now and when mese aewcwfikwws W -M Ol — <br />E. Comments: Cold Started Veeder Root and returned to complete Monitor Certification on all sensors. Tested PLLD's and <br />found all passed. Pull all brine, pan, and sump sensors. Confirmed audible, visual, and positive shutdown. Tested positive shut <br />down and sensor out. Tested overfill and high product. Tested vacuum for high liquid and no vac. <br />Monitoring System Certification Page 2 of 4 <br />12107 <br />2 2/21/07 <br />