Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />® Yes <br />❑ No` <br />Is the audible alarm operational? <br />® Yes <br />❑ No` <br />Is the visual alarm operational? <br />® Yes <br />❑ No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No' <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper operation? <br />❑ Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />® N/A <br />® Yes <br />❑ No` <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />❑ N/A <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />® SumplTrench Sensors, ® Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? ® Yes; ❑ No. L1, 4, 6, 7, <br />® Yes <br />❑ No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />❑ N/A <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capacity does the alarm trigger? 90% <br />❑ Yes* <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes' <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check alf that apply) ❑ Product; ❑ Water. <br />If es, describe causes in Section E, below. <br />®�es❑ <br />No' <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />®❑ <br />No` <br />Is all monitoring equipment operational per manufacturer's specifications? <br />" In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: Cold Started Veeder Root and returned to complete Monitor Certification on all sensors. Tested PLLD's and <br />found all passed. Pull all brine, pan, and sump sensors. Confirmed audible, visual, and positive shutdown. Tested positive shut <br />down and sensor out. Tested overfill and high product. Tested vacuum for high liquid and no vac. <br />Tested Vent Sump 794380-208 and 794380-304 sensor. Both passed. <br />Monitoring System Certification Page 2 of 4 12107 <br />2 2/21/07 <br />