Laserfiche WebLink
Page 1of1 <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Fill Riser Containment Sumps F <br />Fill Riser Containment Sumps are Present, but were Not Tested F <br />Test Method Developed By: r Spill Bucket Manufacturer(: Industry Standard r Professional Engineer <br />r Other (Specify): <br />Test Method Used By: r Pressure r Vacuum ro Hydrostatic <br />r Other (Specify): <br />Test Equipment Used: I_LAKE TE,S..T�] <br />Equipment Resolution: 0 0625 in__ <br />Spill Box # <br />Tank 1 UNLEADED <br />Fill - Direct <br />Spill Box # <br />Tank T-2 PREMIUM <br />Fill - Direct <br />Spill Box # <br />Tank T-3 Diesel <br />Fill - Direct <br />Spill Box # <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />14.00 <br />14.00 <br />14.00 <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />m i n <br />Test Start Time: <br />09:30:00 <br />09:30:00 <br />09:30:00 <br />Initial Reading m,i: <br />14.00 in. <br />14.00 in. <br />14.00 in. <br />Test End Time: <br />10:30:00 <br />10:30:00 <br />10:30:00 <br />Final Reading ma: <br />13.75 in. <br />14.00 in. <br />14.00 in. <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading m�yi: <br />-0.25 in. <br />0.00 In. <br />0.00 in. <br />Pass/Fail Threshold or Criteria: <br />+/- 0.00 <br />+/ 0.00 <br />+/- 0.00 <br />{ /- <br />Test Result: <br />Fail <br />Pass <br />Pass <br />Comments ? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />reg s.b. failed at bad bottom o -ring at the drain. <br />WO: 2302101 <br />