Laserfiche WebLink
MA''r-27-2012 11:09--riv ice Station Systems 488 838 8888 F. 0:3 <br />Monitoring System Certification - Page 2 of i <br />Sitr Address; 10858 Trinity Pkwy Date of Testing./ Servicing: L/r 1 „12 <br />D. Results of Testing / Servicing <br />Software Vcrsion Installed, 329.01 <br />Cntnnlete the fallnwinu cherkikt: <br />❑ Yes <br />® No* <br />is the audible alarm operational? <br />M Yes <br />® No* <br />Is the visual alarm operational'? <br />❑ Yes <br />I® No* <br />Were all sensors visually inspected, functionally,tested, and confirmed operational? <br />❑ Yes <br />M No* <br />1Vere all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their Proper Operation'? <br />Q Yes <br />Q No* <br />If alarms are relayed to a remore monitoring station, is all communications equipment (e.g. modem) <br />® N/A <br />operational'? <br />❑ Yes <br />❑ No* <br />I"or pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />a N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which scissors initiate <br />positive. Shut -down? (Check all Mat apply) p Sump/Trench Sensors, ❑ Dispenser Containment Sensors. <br />Did you confirm positive %hurt -down due to leaks and sensor failure disconnection'? ❑ Yes © No <br />r: Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />x N/A <br />mechanical overfill prevention valvc is installed), is the overfill warning alarm visible and audible at the tank <br />fillpoint(s) and operating properly? if so, at what percent of tank capacity clues the alarm trigger'? <br />Z Yes* <br />❑ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes; or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below_ <br />❑ Yes* <br />9 No <br />Was liquid found inside any secondary containment systems designed as dry systems'? (Check crll that apply) <br />Q Product, ❑ Watcr. If cs, describe causes in Section F. below - <br />0 Yes <br />0 No* I <br />Was monitoring System Set-up reviewed to ensure proper scttin s? (Attach set-up reports, if u ylicahlc.) <br />❑ Yes <br />®No* <br />1s all monitoring equipment operational per manufacturer's Specificiatlons') <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: On site to test the diesel LLD and S2/S6 Vac Sensors only. <br />Replaced the PLLD, Swiftcheck, Turbine O -rings on Diesel. <br />All other Testing completed by Tanknology on a previous date. <br />