My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2012 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:17:35 PM
Creation date
9/5/2018 2:09:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2013
FileName_PostFix
2012 - 2013
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f1A'Y-23-2812 11 12 Service Station Systems 400 938 8888 P.89 <br />Monitoring System Certification - P.ye 3 of 3 <br />Site Address: 10858 Trinity Pkwy Pate of Testing/Servicing._ 518112 <br />F. In - Tank Gauging I SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SW equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perfol-in leak detection monitoring. <br />Com lete the folio ing checklist. <br />❑ Yes C No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were; all tank gauging probes visually inspected for damage and residue buildup:' <br />0 Yes ❑ No* Was accuracy of system product level readings toted? <br />❑ Yes 0 No* Was accuracy of system water level readings tested? <br />❑ Yes © No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufact.urer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): © Check this box if LLD's are not installed <br />w Yes <br />© No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />0 N/A <br />(Checkall that apply) Simulated leak rate: 10 3 g.p.h. (l.): 0 0.1 g.p.h. (1): d 0.2 g.p.h. (2.). <br />Notes: 1, Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification req wired only for electronic LLD start-up. <br />® Yes <br />D No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements' <br />M Yes <br />D No* <br />Was the testing apparatus pro2crly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />® NIA <br />a Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />D N/A <br />M Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected'? <br />19 Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shirt off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />® Yes <br />D No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />D N/A <br />9 Yes <br />❑ No" <br />Were all items on the equipment manufacturer's maintenance checklist complctcd? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: Replaced entire Turbine assembly, purged 500 gallons and Passed 3 gph test. <br />Tested Diesel LLD only, <br />
The URL can be used to link to this page
Your browser does not support the video tag.