Laserfiche WebLink
D. Results of Testing/ Servicing <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />to Yes <br />r No* <br />Is the audible alarm operational? <br />C* Yes <br />f'"' No* <br />Is the visual alarm operational? <br />r Yes <br />is No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />r Yes <br />r No* <br />Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with <br />their proper operation? <br />Yes <br />C No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />r N/A <br />C: Yes <br />r No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />N/A <br />system detects leak, falls to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check <br />all that apply) r Sump/Trench Sensors; r Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? t# Yes; r No <br />f: Yes <br />r No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill <br />r N/A <br />prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If <br />so at what percent of tank capacity does the alarm trigger? 90% <br />Yes* <br />11 No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E below. <br />t` Yes* <br />r No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />r Product; r Water. If yes, describe causes in Section E below. <br />Yes <br />r No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />f' Yes <br />Jr- No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />S-2 AND s-6 failed because they would not see high liquid. die I.d. is inconclusive due to high resiliency.syphon jet valve was replaced and 100 gal was <br />pumped with no change In resiliency. reg s.b. failed at bottom o -ring at drain. all others passed. mon cert failed due to s-2 and s-6. <br />Monitoring System Certification Page 2 of 4 12/07 <br />