Laserfiche WebLink
Page 1 of 1 <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Fill Riser Containment Sumps r <br />Fill Riser Containment Sumps are Present, but were Not Tested r <br />Test Method Developed By: (' Spill Bucket Manufacturer(. Industry Standard <` Professional Engineer <br />Other (Specify): <br />Test Method Used By: Pressure r Vacuum (: Hydrostatic <br />r" Other (Specify): <br />Test Equipment Used: ._LAK_E._TEST_; <br />Equipment Resolution: x.0,_0625 in.,_! <br />Spill Box # <br />Tank 1 UNLEADED <br />Fill - Direct <br />Spill Box # <br />Tank T-2 PREMIUM <br />Fill - Direct <br />Spill Box # <br />Tank T-3 Diesel <br />Fill - Direct <br />Spill Box # <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />14.00 <br />14.00 <br />14.00 <br />Walt time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />m i n <br />Test Start Time: <br />09:30:00 <br />09:30:00 <br />09:30:00 <br />Initial Reading (P,): <br />14.00 in. <br />14.00 in. <br />14.00 in. <br />Test End Time: <br />10:30:00 <br />10:30:00 <br />10:30:00 <br />Final Reading s,i: <br />13.75 In. <br />14,00 In. <br />14.00 in. <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading,R,+y,: <br />-0.25 in. <br />0.00 In. <br />0.00 in. <br />Pass/Fail Threshold or Criteria: <br />+/- 0.00 <br />+/- 0.00 <br />t/- 0.00 <br />t/ - <br />Test Resuit: <br />Fall <br />Pass <br />Pass <br />Comments ? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />reg s.b. failed at bad bottom o -ring at the drain. <br />W0: 2302101 <br />