Laserfiche WebLink
Work Order• 2275500 <br />Monitoring System Certification - Page 3 of 3 <br />Site Address: 10858 Trinity Pkwy Date of Testing/Servicing: 5114/10 <br />F, In - Tank Gauging / SIR Equipment: 19 Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />1 ❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />i ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />.11 O—LIVII n uviuw, drscrlbe now and when these oericiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLD's are not installed. <br />Complete the followine checklist: <br />• Yes <br />❑ No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: M 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated b local agency, certification required only for electronic LLD start-up. <br />• Yes <br />❑ No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />CK Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />CL N/A <br />C1 Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />1 11 Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />M Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />lE Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />11 <br />tz Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />ul JCCUVn n Below, describe now and when tnese deliciencies were or will be corrected. <br />H. Comments: <br />Tanknology Inc. 11000N. MoPac Expressway, Suite 500, Austin, Texas 78759 <br />