Laserfiche WebLink
5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />c. Describe method to be used for decontamination: <br />YES [I NO N <br />Phone <br />. City <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone ( ) <br />Address <br />Permitted Disposal Site <br />Zip <br />Hauler Reg# <br />City Zip <br />6. a. Describe the method that will be utilized to purge and/or inert the piping: <br />EXISTING PIPING WILL BE PURGED WITH NITROGEN PRIOR TO REMOVAL AND REPLACEMENT OF FITTINGS <br />AND UDC. <br />b. Piping Hauler: <br />Name ADAMS SERVICES, INC. Phone (310 X523-4430 <br />Address 406 E. ALONDRA BLVD. city GARDENA // Zip90248 <br />Hauler Registration # (if hauled as hazardous) 3216 <br />c. Piping Disposal Site: <br />Name SIEMENS WATER TECHNOLOGIES CORP <br />Phone(800) 266-7747 <br />Address 5375 S. BOYL AVE <br />City VERNON Zip 90058 <br />EPA ID# (if transported to a permitted TSD facility) CAD097030993 <br />7. Is the sampling firm an independent third party from the contractor? <br />YES [ NO[] <br />a. Identify sampling firm: <br />Name SOIL SEARCH <br />Phone(916 )966-3902 <br />Address 4088 BRIDGE STREET, #9 <br />City FAIR OAKS Zip 95628 <br />b. Identify laboratory performing analysis: <br />Name KIFF ANALYTICAL <br />Phone (530 )297-4800 <br />Address 2795 2ND STREET <br />City DAVIS Zip 95618 <br />8. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />PER THE REQUIRED SAMPLING PROTOCOL. SINCE THE REPLACEMENT OF THE UDC IS DUE TO OWNER <br />REQUEST NOT CONTAMINATION. <br />9. a. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br />Name Hauler Registration # Phone ( ) <br />Address City Zip <br />b. If soil is not to be hauled, describe what will be done with it: <br />EXCAVATED SOIL AND PEA GRAVEL WILL BE PLACED BACK INTO THE EXCAVATED AREA. <br />3 <br />