Laserfiche WebLink
TRAM, TECH CONSUL TA APS <br />Engineering and Environmental Compliance Services <br />License i# 697833 (A-Haz) <br />Since 1987 <br />July 8, 2008 <br />TTC Job Number 2113.01 <br />Mr. Don Mukai <br />Bravo Systems <br />2929 Vail Avenue, Commerce, CA 90040 (323) 888-4133 <br />Sent via .pdf to don@sbravo.com and via FedEx Std. <br />Re: Specification approved by a state registered professional engineer <br />CCR Title 23, Division 3, Chapter 16, Article 3, Section 2631(d) <br />This letter is for an engineering specification review and approval of a secondary <br />containment system element which is not an integral part of primary containment for an <br />underground fuel tank storage system in California. The authority for this approval comes <br />from the California Code of Regulations (CCR) Title 23, Division 3, Chapter 16, Article 3, <br />Section 2631(d). <br />I have examined and reviewed the following specifications on the Bravo F -Series rigid <br />fiberglass reinforced plastic (FRP) fittings: <br />1. UL Certifications Directory MH26018 for Vipel F-764 and 774 resins <br />2. AOC Vipel Product Selection Guide <br />3. AOC Vipel Corrosion Resistance Resin Guide <br />4. Bravo Systems document FS -S -DS 11-07C <br />5. Bravo Systems document FS -S -DS -D 11-07C <br />6. Bravo Systems document FS -A -DS -D 11-07A <br />7. Bravo Systems document FS -1X -D 6-30B <br />8. Bravo Systems document F -Series ADS 11-07A <br />9. Bravo Systems document ii-F-Series-lX-SS-D-08B <br />10. Bravo Systems document ii -F -Series -IX -SS -08A <br />11. Bravo Systems document ii -F -Series -LCX -08B <br />12. Bravo Systems document ii -F -Series -TS -08B <br />13. Bravo Systems drawing F 30 Assembly -Detail -06-30-08 2213[1].dwg <br />14. Smith Red Thread IIA Installation Instructions <br />15. Smith Bulletin D4010 April 15, 2007 <br />16. Smith Bulletin D4025 December 15, 2007 <br />17. Smith Bulletin B2102 May 1, 2006 <br />18. Ameron Dualloy LCX Installation Instruction Bulletin 9903 FP824D (11/07) <br />19. Ameron Dualloy product data FP737F(11/07) <br />20. Ameron Dualloy 3000/L Installation Instructions Bulletin 7501 FP104H (11/07) <br />21. RPM Technology Petrol Seal Weight Loss and Flexibility <br />22. RPM Technology Petrol Seal Swell Test Results <br />www. transtechconsultants. corn <br />930 Shiloh Rd.. Bldg. 44, Suite J • Windsor, California 95492 • Phone: 707-837-8408 - Fax: 707-837-7334 <br />