My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:15:12 PM
Creation date
9/5/2018 3:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2010 - 2011
FileName_PostFix
2010 - 2011
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiber Glass Systems e <br />A r q E H yy^^ 9y RC gg <br />ST <br />has successfully completed Bonder <br />Training as set forth in the SMI— FIBERCAST 8 RCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />U <br />Date <br />Ronowsl of Ne bard <br />or an4r"tlon is «ownwrendod every throe years orwhon <br />s Na epees bonding procors has net been Practiead for a Period of G Magna <br />Fiber Glass Systems,,w <br />STAr <br />has successfully completed Bonder <br />Training as sat forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />c�►Jz21to <br />Date <br />Renewal of the bonder aNriw;un ct rocomnnndod overythmo years ocwhon <br />No spend¢ bedding process has not boon prodtcod ler a period of G months. <br />Fiber Glass Systems - <br />1 Q h 4-LtM has successfully completed Bonder <br />Training as set forth in the SMITH FLPARCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />s,t/a21[o <br />Date <br />Renewal of the bonderarellcation is rexmnandod every Ihreo years orwhon <br />the speafle boodang procoss has not been pradicod ler a period of 6 trealhs <br />Fiber Glass Systems KOY <br />STAR a STVV: i11 <br />Au��nn in iVl 1 has successfully completed Bonder <br />Training as set forth in Ili SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />1.I [Ltd <br />Date <br />Renewal of ilia bonder ar,,Wboo is rocommondod every luso years or when <br />lac spaarm bonding process has no] been pradroad for a period 016 manll s <br />Fiber Glass Systems.e <br />aAid SMITH ° F'fFr2 A <br />J)ayye..n M Ijv-lahu has successfully completed Bonder <br />Training as set forth m the smr4W FIBERCASTTotal Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />ol12.2110 <br />Date <br />Renewal of No bonder ceraacahen is roeemmoodod awry three years or when <br />the spooliic hondaq process has not bean prod eed for a pored of G nionft <br />Fiber Glass systems- voy <br />LijrLA Q iy� 1 VO f�'T1'V)Mtj S has successfully completed Bonder <br />Training akot forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products. <br />os <br />Date <br />Renewal of the bander ardflydlion is mammanded every lhoo yoois or when <br />the spearrs bonding procass has not bean prod xd for a period of 6 nanths <br />Fiber Glass Systems , iffeK- <br />r <br />KrY1 r m has successfully completed Bonder <br />Training as set forth In the S T14 FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />01129110 <br />Date <br />Ronowal of Na bonder ardrmhon is r000mmondod awry three trials or when <br />the epoaile bonding process hos not been practiced for a period of 6 Mothss. <br />Fiber Glass Systems e ? I <br />STAR a -1?%11 k H ° FiRERCAST II <br />I{ <br />Mi n u P 1 C_� l� has successfully completed Bonder ; <br />Training stitkall forth in MrrH FIBERCAST Total Quality Installation Program i <br />for the installation of UL listed primary and secondary containment products. <br />I! <br />1 22 10 <br />Date )� <br />Renewal of dna bor;derardrirahon o roconmanded awry Ihmo years or whop <br />the specific bonding rxoass los riot boar practiced fora period of a months. <br />i <br />Fiber Glass systems w <br />STAR b SMITIH , FiBERCAS71 <br />ui s ES,2a rpt. has successfully completed Bonder <br />Training as sat forth in the SMITH FIBERCAST Total Quality Installation Program <br />for the installation of UL listed primary and secondary containment products <br />i <br />UI/2-211 O <br />Date <br />i <br />Renewal of the bonder ardriafion is mammorWod awry, three years or when <br />the apedfic bonding process has not boon pradicod for a period of G month, <br />
The URL can be used to link to this page
Your browser does not support the video tag.