My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:15:12 PM
Creation date
9/5/2018 3:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2010 - 2011
FileName_PostFix
2010 - 2011
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1 Site map enclosed? YES Fj NO [ ] <br />2 Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing -3ank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): 4L <br />REPLACE BLUELINE FITTINGS AT SUMPS, REPLACE BRAVO UDC'S AT DISPENSERS AND REPLACE BLUELINE <br />FITTINGS AT VENT BOX. REMOVE ALL BLUELINE FITTINGS AT SUMP, UDC, AND VENT BOX, REPLACE <br />WIT -H SMITE PITTINGS(IDRIMARVIISECONDARY) AND BRAVO F -17 -RR -r) T <br />VOLTAGE) ALL FITTINGS WILL BE ADHERED WITH PROPER ADHESIVE, MSDS ATTACHED BRAVO B8000 <br />REMOVED WILL BE REPLACED WITH NEW BRAVO B8000 B -D -AB <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />#7014 FIBERGLASS SYSTEMS ADHESIVE KIT <br />#012030-626-0 UL LISTED FIBERGLASS SYSTEMS (SMITH) BONDED DOUBLE WALL SUMP ENTRY TERM <br />#B8000 -B -D -AB BRAVO DOUBLE WALL DEEP DISPENSER CONTAINMENT <br />#F -17 -RR -D BRAVO DOUBLE WALL UNIFITTINGS <br />#011020-069-2 UL LISTED FIBERGLASS SYSTEMS RED THREAD IIA PRIMARY PIPING 2" <br />#011030-069-2 UL LISTED FIBERGLASS SYSTEMS RED THREAD IIA SECONDARY PIPING 3" <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.