NEYNOTES-9- TESTING REQUIREMENTS
<br /> ITEM PROV. INST. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE FURNISHING OF ALL. TESTING
<br /> NO: BY: BY: REQUIREMENTS AS INDICATED HEREIN UNDER NO CIRCUMSTANCE SHALL THE GENERAL
<br /> CON-TRACTOR OR HIS DESIGNATED FUEL SYSTEM INSTALLER/ SUB.-CONTRACTOR BE o
<br /> JIB G.C. INSTALL (2) BELOW GRADE "XERXES' DOUBLE WALL FIBERGLASS STORAGE TANKS, PERMITTED TO CONDUCT SAID TESTS. ALL 'TESTS SHALL BE CONDUCTED AND PERFORMED
<br /> El 1F�I�T'
<br /> MANUFACTURED BY XERXES CORPORAITON. (1) 20,000 GAL., (10ft DIA,) FIBERGLASS TANK DE T-M
<br /> BY A QUALIFIED THIRD PARTY IT AGENCY PREVIOUSLY APPROVED BY 'ME PROJECT
<br /> AND (1) 20,000 GAL., (10ft DIA.) -,-12K/8K SPLIT FIBERGLASS TANK. (SEE SHEET F2.0) OWNER, ALL COSTS FOR ALL TESTS SHALL BE -THE RESPONSIBILITY OF THE GENERAL
<br /> FflJIB G.C. INSTALL (6) NEW DISPENSERS, INCLUDING ALL HEALY SYSTEM COMPONENTS (NOZZL-ES, CONTRACTOR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO PRODUCE AND 9330 BALBOA AVENUE
<br /> HOSES, VAPOR PUMPS, BREAKAWAYS, ETC.), DISPENSERS SHALL BE INSTALLED SUBMIT A MINIMUM OF TWO (2) COPIES OF ALL TEST RESULTS. GENERAL CONTRACTOR
<br /> "ON--GRADE" ON NEW DOUBLE WALL DISPENSER CONTAINMENT BOXES WITH SUMP SHALL. ALSO BE RESPONSIBLE TO SUBMIT TEST RESULTS TO ANY AND ALL FIELD SAN DIEGO, CA 92123
<br /> SENSORS. REFER TO SHEET' F5.0. INSPECTORS AND FUEL RELATED REGULALORY GOVERNMENTAL AGENCIES, UPON FINAL
<br /> APPROVAL OF THE COMPLETE FUEL SYSTEM, T11E GENERAL CONTRACTOR SHALL PROVIDE V 1999 Jack in the Box Inc.
<br /> G.C, G.C. 2" DIA. FIBERGLASS PRODUCT PIPING FROM SUB--PUMP TO DISPENSER LOCATIONS WITHIN THE JIB CONSTRUCTION MANAGER WITH TWO (2) COMPLETE SETS OF ALL TESTING RESULTS
<br /> 3" DIA. SECONDARY CONTAINMENT FIBERGLASS PIPING AS SHOWN. SLOPE I-INES 1/4- IN ADDITION TO THE TWO (2) SETS PREVIOUSLY INDICATED HEREIN, 'These drawings and specifications
<br /> PER FOOT MIN. TOWARDS TANKS, are the property of Jack in the Box Inc
<br /> and shall not be copied or reproduced
<br /> G.C. G.C. OVER EXCAVATE TT-{E TANK HOLE TO ALLOW FOR SAFE INSTALLATION OF' NEW PRODUCT TESTING REQUIREMENTS SHALL BE AS FOLLOWS- without its previous written consent.
<br /> TANKS.
<br /> JIB G.C. INSTALL NEW DOUBLE WALL SUMP RISER, PRODUCT, VENT AND VAPOR ASSEMBLY PACKAGE, TEST #1 PRE--TFST EVALUATION FOR THE ENHANCED LEAK DETECTION SYSTEM,- CALIFORNIA ONLY
<br /> AUTOMATIC TANK GAUGE SYSTEM AND SUMP SENSOR AT ALL. TANKS. SEE ALL ATTACHED IFST #2 TANK AND LINE TEST (SYSTEM INTEGRITY) - (IF REQUIRED).
<br /> FUEL INSTALLATION DRAWINGS FOR EQUIPMENT AND DETAILS. CONTRACTOR SHALL PROVIDE 11-51- #3 PRESSURE DECAY TEST, dates
<br /> LOCK WITH KEY AT FILL TUBE LOCK CAP.
<br /> ECIJIB G.C. INSTALL NEW DOUBLE WALL SUMP RISER, TURBINE AND SUMP SENSOR, INCLUDING ALL_ TEST #4 A/L TFST (VAPOR N-INES), RELEASE: OCT, 25, 2004
<br /> CONDUITS, WRING AND EQUIPMENT PER MANUFACTURER'S INSTALLATION REQUIREMENTS. RUN TEST #5 BLOCKAGE _FEST (VENT & VAPOR), f'. ,(JIB ONLY):
<br /> CONDUIT TO NEW VEEDER ROOT PANEL LOCATED IN THE CONVENIENCE STORE, TEST #6 NEW CONSTRUCTION ENHANCED LEAK DETECTION TEST (NCEL,D).- CALIFORNIA ONLY
<br /> Efl JIB G.C. INSTALL NEW DOUBLE WALL VENT TRANSITION SUMP WITH SUMP SENSOR, RISER RACK PERMIT:
<br /> ASSEMBLY, VENT RISER PIPES AND VENT CAPS, AND HEALY CLEAN AIR SEPARATOR TANK. BID:
<br /> REFER TO SHEET F6.0 AND DETAIL 8/F4.0,
<br /> G.C. G.C. NEW 2" DIA. WITHIN 3" DIA. SECONDARY CONTAINMENT FIBERGLASS TANK VENT LINES.
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br /> -----------------_
<br /> GENERAL NOTES:
<br /> Contact: Xerxes Corporation LIMIT OF PETROLEUM CONIRACTORS WORK:
<br /> m co ---------------- 3001 Douea$ BNd #210
<br /> 3N� (a -7901 Xerxes Avenue South IN \REAS REC 1V'NG AC PAVING, PETROLEUM
<br /> -05 1, CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT AND PERMITS "TO PERFORM THE WORK AS INDICATED ON
<br /> 45 Suite 201 C01TRACIOR HAI..L BACKFILL. AND COMPACT AL.I Rosevie, CA 9.%61
<br /> � m THIS SHEET, CONTRACTOR SHALL VISIT' THE SITE TO VERIFY ALL CONDITIONS THAT MAY EFFECT 11-11S PROJECT. 1R1: CHS ANF EXCAVATIONS AS SPECIFIED. THESE
<br /> Do Minneapolis, MN 55431
<br /> ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL CODES AND PER MANUFACTURER'S RECOMMENDATIONS, ARI AS SHALL BE CLEARED AND SCRAPED LEVEL WITH Td 916r--771-2555
<br /> 0 1 Attn: Beverly Shull ADJACENT SURFACES, ALL AREAS WITHIN L.IMITS
<br /> 1 01, Fw. 916-771-9255
<br /> 03 2. INSTALL ALL TANKS, PIPING, DISPENSERS, EQUIPMENT, ELECTRONICS, ELECTRICAL CONTROLS, ETC, PER Phone: 952-.887--1890
<br /> CL, I OU L111PNIED SHALL 13E LEFT READY FOR FINAL. GRADING
<br /> < MANUFACTURER'S RECOMMENDATIONS AND PROCEDURES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO Fm 952-887-1882 ANI PLACEIVEJ-1 OF SUB-BASE AND PAVING,, THE Web: rhidesigicom
<br /> .0 NEW AND/OR EXISTING EQUIPMENT ABOVE OR BELOW GRADE. THE PRESENCE OF THE MANUFACTURER OR bshullgxerxescorp.com Lim I WN IN NOT INTENDED TO DEFINE OR
<br /> "R CONTAIN I-HE TOTAL SCOPE OF THE PETROLEUM
<br /> OBSERVER AT AN INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR THE CONIRACFOR'S WORK NOR DOES IT RELIEVE _ME &Wmki� CA Mvdw4 CA Rwo&, CA
<br /> 05 PROPER INSTALLATION OF THE TANKS, PIPING AND/OR EQUIPMENT. _F _.�RFORIVING WORK B*,m,WA Petalim, CA
<br /> Contractor shall have a current certification from Smith Piping as PE[ROI EUM CONI �ACJOR FROM PIE
<br /> -1 a trained and
<br /> E 1 CONTRACTOR SHALL WARRANTY ALL WORK AND MATERIALS FOR (1) YEAR, OUTSIDE THE I IKAITS DESCRIBED, THE LIMIT LINE SHOWN
<br /> :3 qual RHL JOBS: J11305002.2_
<br /> 0 0 ified contractor for the handlino and installation of fuel piping. Contractor shall be DOES NOT EXCLUDE THE GENERAL CONTRACTOR FROM
<br /> 4. THESE PLANS ARE SCHEMATIC ONLY. GENERAL. SCOPE IS DEFINED. VERIFY ALL INSTALLATIONS AND EQUIPMENT re--certified every 3 years. PERFORMING WORK WIT-HIN THE SCOPE OF HIS
<br /> Im -
<br /> W _3 Contact: Smith Fiberglass CONTRACT C'ONFAINEID INSIDE THE LIMIT LINE site information
<br /> "A
<br /> WITH OWNER AND/OR REPRESENTATIVE OF THE EQUIPMENT MANUFACTURER.00 2.700 W. 65th Street
<br /> 5. CONTRACTOR IS RESPONSIBLE FOR BLUE STAKING THE EXCAVATION AREAS AND LOCATING ANY UNDERGROUND Little Rock, AR '72209
<br /> UTILITIES. RE---ROUTE ANY EXISTNG UTILITIES AROUND CANOPY AND FUEL SYSTEMS IF REQUIRED, Attn. Dart' HethcoxMK TYPE: 8ECBRL..N68
<br /> W 0
<br /> 0 6. FUEL PIPING DRAWINGS ARE SCHEMATIC ONLY. VERIFY ALL. INSTALLATIONS AND EQUIPMENT W"TH Phone: 501618,-2220
<br /> LO
<br /> 0 MANUFACTURER RECOMMENDATIONS AND PER APPLICABLE GOVERNING CODES. Fax: 501--568-4465
<br /> JIB #: 4,374
<br /> • '7. ALL VENT AND PRODUCT LINES FROM ISLANDS TO TANKS ARE DRAWN FOR SCHEMATIC PURPOSES ONLY.
<br /> al � Yqeder-Root: ----------- ------
<br /> CONTRACTOR SHALL FIELD VERIFY BEST AND SHORTEST ROUTE OF ALL VENT AND PRODUCT LINES FROM 'ONTRAGFOR 10 PROVIDE CANOPY CANOPY AND PETROLEUM ADDRESS:
<br /> Contractor sholl have a current certification from Veeder-Root as a trained and PETROLEUM C
<br /> ISLANDS TO TANKS, MAINTAINING ROUTE OF LINES ON FURTHEST SIDE AWAY FROM BUILDING, ALL PIPING qualified contractor to install, test and service said equipment. Contractor shall have ROOF' DRAIN SYSTEM, INCLUDING CLEANOUJS, CONTRACTORS 10 COORDINATE
<br /> CONNECTIONS AT MPD'S SHALL BE ON OPPOSITE SIDE FROM ELECTRICAL CONNECTIONS, AND MAKE CONNEC110N -1-0 THE STORM DRAIN EXCAVATION FOR AND
<br /> at a minimum a Level 2/3 and a "Secondary Containment Vacuum Sensing System" or
<br /> 5-1 < SYSTEM AT CATCH BASIN LOCATED ON ")ITE- INSTALLATION OF CANOPY 10858 TRINITY PKY,
<br /> 0 U a Renewal Cert, of July 1, 2004 or later certification from Veeder-Root, If contractor
<br /> 8, UPON COMPLETION OF PIPING SYSTEM, CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL COORDINATE ALL SEE CIVIL AND U71LITY PI AN, MAINTAIN FOOTINGS. REFER 10 CANOPY
<br /> I DRAWINGS FOR FOOTING
<br /> is conducting warranty work, then said contractor must be contracted directly by MINIMUM 12" SEPARATION BETWEEN PRODUCT PHASE 11 VAPOR RECOVERY AND TIGHTNESS TESTS. CONTRACTOR SHALL CALIBRATE ALL DISPENSERS AND S_F0(.-,KT_0N, CA 95219
<br /> Veeder--Root, PIPING AND CANOPY ROOF DRAIN SYSTEM. DESIGN.
<br /> SEALS, CONTRACTOR IS RESPONSIBLE FOR START.-UP AND SHALL INSTRUCT OWNER THOROUGHLY IN USE OF
<br /> Contact: Veeder-Root
<br /> ALL NEW EQUIPMENT,
<br /> 125 Powder Forest Drive DRAWN BY: WLW
<br /> 9? 0
<br /> 9, CLEAN UP DEBRIS AND DISPOSE OF, ON A CONTINUOUS BASIS, ALL REMOVED PAVING AND EXCAVATION SOIL. Simsbury, CT 06070
<br /> iAttn: Annetta Womble
<br /> Y SCALE: 1" = 20'-0"
<br /> 10. ANY CONTRADICTIONS ON THESE PLANS SHALL BE REPORTED TO THE ARCHITECT OR JIB CONSTRUCTION Technical "Training Registrar
<br /> FUEL PIPING
<br /> MANAGER IMMEDIATELY, CONTRACTOR SHALL VERIFY EXACT SCOPE OF WORK WITI-i OWNER. Phone: 336-5475743
<br /> Fax: 336--547-5359 FUEL PIPING
<br /> A), 0 11. CONTRACTOR IS RESPONSIBLE TO REGISTER NEW TANKS IN ACCORDANCE WITH ALL LOCAL CODES AND AGENCIES a nn etta.worn bi e0gil barco, m
<br /> co
<br /> -a CONCERNED. SITE PLAN
<br /> ]M5_Q1,Ld_1Q_mLkAA.,3_r_Q wn-X
<br /> 12, CONTRACTOR IS RESPONSIBLE FOR ALL WRING, BUT WILL NOT APPLY POWER To -ITiE SYSTEM. B x--- Al 1aF 20' PLAN
<br /> 11 CONTRACTOR SHALL NOTIFY JIB CONSTRUCTION MANAGER AT LEAST 2 DAYS PRIOR TO COVERING PIPING AND All electrical contractors and/or sub contractors that work on or in the PowerBox
<br /> CONDUIT TRENCHES SO AS TO ALLOW A SITE INSPECTON AND PHOTOGRAPHING TO NOTE ANY DEVIATIONS FROM Solution OSM or circuit manager must have a "General Product Knowledge" form on file
<br /> PLANS, IF ANY, with PowerBox Solutions and the JIB Construction Manager, NORTH
<br /> Contact: PowerBox Solutions
<br /> '14. ALL EQUIPMENT INSTALLED SHALL BE COMPATIBLE WITH THE PRODUCT STORED OR DISPENSED. 4350 Southmark Drive
<br /> 15. TI-ilS DRAWING DOES NOT INDICATE TI-LE THE LOCATION OF ALL EXISTING OR PROPOSED UNDERGROUND UTILITIES, Salisbury, NC 28147 FS1 m0
<br /> IT IS THEREFORE NECESSARY TO EXERCISE CAUTION WHILE AND TRENCHING. Phone: 704,--645--2630
<br /> Attn: Hunter Nash
<br />
|