Laserfiche WebLink
KEY NOTES" <br />ITEM <br />PRQV |NST, <br />NO: <br />BY: BY: <br />FilJ|B <br />(�CL <br />|NSTALL (2) BELOWSRADE =XERXES-D0JBLE WALL FIBERGTANKS,BERGLASS 3TDRAGE TAN� <br />MANUFACTURED BY XERXES CORPORATION. /1\ 20^000 GAL.. /10ft D|&\ FIBERGLASS TANK <br />AND (1) 20.000 CAL., /10ft DIA,) -12K/8K SPLIT FIBERGLASS TANK. /SEE SHEET F2.0\ <br />| 7 | <br />JIB G.C. <br />INSTALL /�\ NEW DISPENSERS, INCLUDING ALL H�ALY SYSTEM COMPONENTS (NOZZLES' <br />` / ' ` <br />L�� <br />HOSES, VAPOR PUMPS, BREAKAWAYS, ETC.). 08zEW3ER5 SHALL BE INSTALLED <br />"ON -GRADE" ON NEW DOUBLE WALL DISPENSER CONTAINMENT BOXES WITH SUMP <br />SENSORS. REFER TO SHEET F5.0. <br />LAG' <br />G C°D|A. <br />' '. <br />FIBERGLASS PRODUCT P|P|Ng FRQM SUB. -PUMP TO D|SPENSER LOCATIONS�N� "THINH|N <br />2C <br />3" Q|A, SECONDARY CONTAINMENT FIBERGLASS PIPING AS SHOWN, SLOPE LINES 1/4 - <br />/4'PER <br />PER FOOT MIN. TOWARDS TANKS, <br />El <br />G.C, 5. C. <br />OVER EXCAVATE THE TANK HOLE TO ALLOW FOR SAFE INSTALLATION OF NEW PRODUCT <br />TANKS. <br />| 5 | <br />JIB G.C. <br />INSTALL NEW DOUBLE WALL SUMP RISER, PRODUCT, VENT AND VAPOR ASSEMBLY PACKAGE, <br />L.... <br />AUTOMATIC TANK GAUGE SYSTEM AND SUMP SENSOR AT ALL TANKS, SEE ALL ATTACHED <br />FUEL INSTALLATION DRAWINGS FOR EQUIPMENT AND DETAILS. CONTRACTOR SHALL. PROVIDE <br />LOCK WITH KEY AT RLL TUBE LOCK CAP, <br />i n | <br />JIB G � <br />. . <br />INSTALL NEW DOUBLE ��U- SUMP RISER, TURBINE AND SUMP SENSOR, INCLUDING ALL <br />CONDUITS, WRING AND EQUIPMENT PER MANUFACTURER'S INSTALLATION REQUIREMENTS, RUN <br />CONDUIT TO NEW YEEDER ROOT PANEL LOCATED IN THE CONVENIENCE STORE. <br />| � | <br />J|8 G.C. <br />INSTALL NEW DOUBLE WALL VENT TRANSITION SUMP AND RACK SYSTEM YMTH SUMP SENSOR, <br />�--� <br />VENT RISER PIPES AND VENT CAPS, REFER TO DETAIL 8/F4.0. <br />| m | <br />. . . . <br />G� � � <br />NEW �" �|A WITHIN 3° DIA. SECONDARY CONTAINMENT FIBERGLASS TANK VENT LINES. <br />^ <br />SLOPE LINES 1/4" PER FOOT MINIMUM BACK TO TANKS. <br />P-9-1- <br />G.C.G.C. <br />NEW 3= D|A, WITHIN 4" DIA. SECONDARY CONTAINMENT PHASE U TRUNK UNE FROM GASOUNE <br />TANKS TO D|SPENSERS, SLOPE 114" PER FOOT MINIMUM BACK TO REGULAR UNLEADED TANK, <br />�x� | <br />G.C. GC. <br />�/ 4° 0A. SECONDARY CONTAINMENT FIBERGLASS <br />REDUCE PHASE U PIPING FROM 3° DIA. ' <br />[.~1 <br />" <br />TO 2" D/A, 2[ DIA. SECONDARY CONTAINMENT FIBERGLASS INTO EACH DISPENSER AREA. <br />ATTACH TO PHASE U CONNECTIONS FROM DISPENSER. <br />|S <br />FH <br />^ C. G. C. <br />C � � <br />UP0W COMPLETION OF ALL WORK, ALL PRDDUCT LINES ARE TD 8E PURGED AND CLEANED <br />] <br />OUT CONTRACTOR SHALL RE RESPONSIBLE FOR THE CALIBRATION OF ALL DISPENSERS AS <br />REQUIRED. <br />FL2] <br />. . . , <br />Q C � � <br />UPDN INSTALLATION, TESTING AND APPROVALS OF NEWP|P|NQ, CONDU|T. PLUMB|NG' ETC, <br />FOR THE TANK INSTALLATION, BACKFILL EXCAVATED AREAS WITH NEW PEA GRAVEL AND <br />PROVIDE CONCRETE PAVING PER CIVIL PLANS. <br />NOTE: 8" THICK, 4000 PSL, MIN. REQUIRED AT TANK AREAS WITH #4 RE0AR AT 12= <br />O.C. BOTH WAYS /TYo.\. SEE SHEET F2.0. <br />n <br />G.C, G.C. <br />NEW 2-A 20-B'C FIRE EXTINGUISHERS IN CABINET AT CANOPY COLUMNS AND AT BUILDING <br />ADJACENT TD CASHIER YMNODVV AREA AS SHOWN. (EXACT LOCATION TO BE FIELD VERIFIED <br />NTH FIRE DEPT.) <br />�u� | <br />' ` JIB � � <br />INSTALL NEW EMERGENCY PUMP SHUT-OFF'-OFF'Y0 -' �IN ACCORDANCE WITH CFC LATEST <br />- <br />['-'] <br />EDITION, LOCATED AS SHOWN ON PLAN. LOCATIONS BE CLEARLY IDENTIFIED NTH SIGNS <br />LABELED "EMERGENCY FUEL SHUTDOWN DEVlCE~, LOCATE ONE E.S.O. SWITCH ON BUILDING <br />NO MORE THAN 48" ABOVE FINISHED GRADE OR WALKWAY. LOCATE SECOND E,S.O, ON <br />FREESTANDING PED|3TAL AND CONCRETE FOOTING. LOCATE AS TO WHERE SWITCH IS NO <br />GREATER THAN 4.8° ABOVE ADJACENT YARD PAVING VNTH A MAXIMUM REACH OF 20°. <br />�»� | <br />, . �. C G C, <br />INSTALL NEW SIGNS PROHIBITING SMOKING, PROHIBITING DISPENSING INTO UN -APPROVED <br />[.~1 <br />CONTAINERS AND REQUIRING VEHICLE ENGINES TO BE SHUT OFF DURING FUELING ON EACH <br />CANOPY COLUMN, /EXACT LOCATION TO BE FIELD VERIFIED WITH FIRE DEPT.) <br />L6] <br />JIB G.C.ALL <br />INSTALL OVERFILL ALARM AND ACKNOWLEDGMENT SWITCH ON YARDUGHT ' POLE. SUPPLY <br />NECESSARY CONDUITS AND C0NDUCTQRS, MOUNT SWITCH AT f5'-0" ABOVE FINISH <br />GRADE. BOTH ALARM AND ACKNOWLEDGMENT SWITCH SHALL BE SURFACE MOUNTED AND <br />SHALL BE IN DIRECT V1EVY OF THE FUEL DELIVERY DRIVER DURING OFF-LOADING <br />PROCEDURES. REFER TO DETAIL ON ES1.0 <br />r <br />JIB G'C' <br />INSTALL NEV INTERSTITIAL. SPACE SENSOR AND MANHOLE. SEE DETAIL B/F- .O. <br />EiC. (C, <br />INSTALL NEW ENHANCED LEAK DE7ECT1ON CONDUIT(SUPPLIED BY CONTRACTOR) AND <br />-- <br />MANHOLES. SEE ATTACHED EL0 DRAWING FOR CONDUIT LOCATIONS AND DETAILS, <br />Fifl <br />. . <br />J|� � � <br />|NSTALL NEYY VEEDER-ROOT TLS -350 |N CDNVEN|EMCE STORE. REFER TD ELEQTR|CAL <br />AND ARCHITECTURAL PLANS FOR EXACT LOCAT10N OF PANEL. FINAL LOCATION SHALL BE <br />APPROVED BY LOCAL FIRE AND/0R ENVIRONMENTAL HEALTH DEPARTMENT INSPECTORS. <br />�`n | <br />P�v| <br />J|� Q^ Q , <br />VEEDER-ROOT )SD PHASE U VAPOR FLOW METER AND ALL ASSOCIATED EQUIPMENT AND <br />�--' <br />CONDUIT. SEE SHEET F5.0L <br />| ", | <br />JIB G.C. <br />VEEDER-ROOT ISD PHASE U VAPOR PRESSURE SENSOR AND ALL. ASSOCIATED EQUIPMENT <br />L-� <br />AND CONDUIT AT DISPENSER CLOSEST TO THE TANKS. IF A ROW OF DISPENSERS are <br />EQUAL DISTANCE THE TANKS AND WITHIN 10 FEET OF EACH OTHER, ANY DISPENSER CAN <br />BE USED. SEE SHEET F5,0. <br />�/� | <br />GC � � <br />' ` ' ' <br />NEW 2" DIA. WITHIN 3" DIA. SECONDARY CONTAINMENT FIBERGLASS TANK CROSSOVER LINES <br />' ' <br />[��| <br />FOR VACUUM MONITORING TUBES. LINES NEED NOT BE SLOPED. <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE FURNISHING OF ALL TESTING <br />REQUIREMENTS AS INDICATED HEREIN UNDER NO CIRCUMSTANCE SHALL THE GENERAL <br />CONTRACTOR OR HIS DESIGNATED FUEL SYSTEM INSTALLER/ SUB -CONTRACTOR BE <br />PERMITTED TO CONDUCT SAID TESTS. ALL TESTS SHALL BE CONDUCTED AND PERFORMED <br />BY A QUALIFIED -THIRD PARTY TESTING AGENCY PREVIOUSLY APPROVED BY THE PROJECT <br />OWNER, ALL COSTS FOR ALL TESTS SHA[[ BE THE RESPONSIBILITY OF THE GENERAL <br />CONTRACTOR. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO PRODUCE AND <br />SUBMIT A MINIMUM OF TWOCOPIES OF ALL TEST RESULTS, GENERAL CONTRACTOR <br />SHALL ALSO BE RESPONSIBLE TQ SUBMIT TEST RESULTS TD ANY AND ALL FIELD <br />INSPECTORS AND FUEL RELATED REGULATORY GOVERNMENTAL AGENCIES. UPON R@A[ <br />APPROVAL OF THE COMPLETE FUEL SYSTEM, THE GENERAL CONTRACTOR SHALL PROVIDE <br />THE JIB CONSTRUCTION MANAGER WITH TWO /2\ COMPLETE SETS OF ALL TESTING RESULTS <br />IN ADDITION TO THE TWO (2) SETS PREVIOUSLY INDICATED HEREIN. 1 <br />TEST #1 PRE-TEST EVALUATION FOR THE ENHANCED LEAK DETECTION SYSTEM.- CALIFORNIA ONLY <br />TEST #2 TANK AND LINE TEST /SYSTEM INTEGRITY) - (|F REQU|RED). <br />TEST #J PRESSURE DECAY TEST <br />TEST #4 A/L TEST (VAPOR UNES). <br />TEST #5 BLOCKAGE TEST /VENT & VAPOR), <br />TEST #6 NEW CONSTRUCTION ENHANCED LEAK DETECTION TEST (NCE[D),- CALIFORNIA ONLY <br />1^ THE BALL FLOAT VALVE SHALL BE SET AT 95% CAPACITY. <br />2, TI -IE 7LW/U\ERRLL ALARM SHALL BE SET AT 90% CAPACITY FOR OVERFILL PROTECTION. <br />3, ALL LEAK DETECTION SENSORS SHALL BE WIRED FOR "POSITIVE SHUT DOWN" AND "FAIL <br />SAFE" OF THE TURBINE W`HEN 8 LEAK IS DETECTED, <br />TANK # FUEL TYPE TANK SIZE <br />#1 REGULAR UNLEADED 20,000 GAL <br />b DIESEL 8,000 GAL. <br />VENT ----------V---------- <br />VAPOR RETURN ----------N�---------- <br />SUPER UNLEADED U <br />UNLEADED U <br />DIESEL D <br />CROSS OVER C <br />JIB FUEL CONTRACTOR CERTIFICATION REQUIREMENTS <br />The Fuel Contractor, fuel electrical contractor respective sub contractors <br />mhoU possess experience in the installation of fuel facilities and in the specific fuel <br />manufacturers/components as specified herein. In addition, the fuel contractor and fuel <br />e|mntr|co| contractor must meet the following minimum certification requirements, Fuel <br />Contractors and/or sub contractors not certified as follows shall not be permitted to <br />work on this project. <br />Contractor shall have o current certification from Xerxes as q trained and qualified <br />contractor for the handling and installation of Xerxes tanks. Contractor shall be <br />,e-cerUfled every 3 years. <br />Contact: Xerxes Corporation <br />7901 Xerxes Avenue South <br />Suite 201 <br />Minneapolis, MN 55431 <br />Attn: Beverly Shull <br />Phone: 952-887-1890 <br />Fox: 052-887-1882 <br />behu|\Oxmrxemcnrp,corn <br />Contractor shall have o current certification from Smith Piping as m trained and <br />qualified contractor for the handling and \nofoUotlon of fuel piping, Contractor shall be <br />re -certified every 3 years. <br />Contact: Smith Fiberglass <br />2700 VK 65th Street <br />Little Rock' AR 72209 <br />Attn: Daryl Hethoox <br />Phone: 501-618-2220 <br />Fax: 501-568-4465 <br />�gAg.-.1got., <br />Contractor shm|l have a current certification from Vnmder-Root as m trained and <br />qualified contractor to install, test and service said equlpmant. Contractor mho|| have <br />at u minlnnUnn o Level 2/3 and o "Secondary Containment Vacuum Sensing System" or <br />o Renewal Cert. of July 1, 2004 or later certification from Veeder-Root, If contractor <br />is conducting warranty work, thmn said contractor must be contracted directly by <br />Veeder-Root. <br />Contact: Veeder-Root <br />125 Powder Forest Drive <br />3|nnsbug\ CT 06070 <br />Attn: Annotto Womble <br />"Technical Training Registrar <br />Phone, 336-547-5743 <br />Fox: 338-547-5359 <br />mnnetta.womb|eOmi|borco.corn <br />All electrical contractors and/or SUb contractors that work on Or in the PuwerBnn <br />Solution QSM or circuit manager must have o "General Product Knowledge" form on fi{m <br />with PowerBo% Solutions and the JIB Construction Manager. <br />Contact-, PowerBox Solutions <br />4350 Southmark Drive <br />Salisbury, NC 28147 <br />Phone: 704-645-2630 <br />Attn: Hunter Nosh <br /> <br /> <br /> <br /> <br />9330 BALBOA AVENUE <br />SAN DIEGO, CA 92123 <br />O 1999 wuuk in the Box Inc. <br />These drawings and specifications <br />are the prvporty of Jock in the Box Inc <br />and ohoU not be copied or reproduced <br />without its previous written consent. <br />ST(}CKT[)N, C/\ 95219 <br />DRAWN BY: WLW <br />FUEL PIPING' <br />PLAN <br />