My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 3:02:30 PM
Creation date
9/6/2018 10:43:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2009
FileName_PostFix
2009
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/2009 11:06 FAX 9163712540 BZMAINT U004 <br />B.Z. Service Station Maillltenance, Inc - <br />63 0 <br />nc•630 Houston Street — P.O. Box 933 <br />West Sacramento, California 95691 <br />Phone (916) 371-2380 <br />Fax (916) 371-2540 <br />Lic. 4433159 <br />Please note: Removed liquid and brine from UDC's and sump onNember 7, 2008. <br />Will need to finish checking site after permit is applied and approved, <br />Listing of repairs needed: <br />• UDC # i&2 need new brine reservoir, hose and fittings, <br />UDC # 3&4 Diesel meter leaking needs to be replaced, dripping onto inlet flex <br />line, need new brine reservoir, hose and fitting. Meter was repaired. <br />• UDC## 5&6 needs new reservoir, hose and fitting. <br />• UDC# 11&12 Diesel meter leaking needs to be replaced. Needs new brine <br />reservoir, hose and fittings. Meter was repaired. <br />UDC# 18 Diesel riser on spill bucket too high need to remove 6" x 4" close <br />nipple at base of bucket and install 4" close nipple. <br />All dispenser bases need to be resealed between UDC and bases. <br />• Need new bucket reducer boots on all fill and vapor sumps. (Please note that this <br />Philtite system is not a vapor Me system.) <br />Need re -cold start Veeder Root monitor and re map ISD and program from start <br />due to last cold start by others was not done correctly. <br />Please advise BZ Service Station Maintenance if there are any further repairs that you <br />would like done. Also please let us know what repairs are going to need permitting. <br />BZ Service Station Maintenance will work diligently to make the needed repairs and <br />submit paperwork for permitting in a timely manner. <br />If you have any questions, or need to advise please contact Paul Lnsele or Kim Hern at <br />(916) 371-2380 or you may email at zss att al.nt. <br />Sincerely, <br />Paul Ensele <br />
The URL can be used to link to this page
Your browser does not support the video tag.