Laserfiche WebLink
a <br />Ir 1 <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION ❑ 1. NEW PLAN Q 2. CHANGE OF INFORMATION <br />M01. <br />PLAN TYPE ❑x MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME)° <br />Quick Stuff # 7745 <br />BUSINESS SITE ADDRESS 26015 Newport Rd 04' <br />CITY Menifee <br />11. EQUIPMENT TESTING AND PREVEN7TVE-MATNTENANCL <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment e.g., sensors, pro es, line leak detectors, etc. e <br />performed at the frequency specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be <br />performed by qualified personnel. <br />MONITORING EQUIPMENT 15 SERVICED 1. ANNUALLY M06. ❑ 99. OTHER (Specify): <br />Mol. <br />III. MONITORING LOCATIONS <br />1s monitoring plan must include a Site Plan showing the general tanK an piping layouts and the locations where monitoring Is performed i.e., location of each <br />sensor, line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System <br />Certification form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />x❑ 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENTVAULT(S) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑x b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M11. <br />PANEL MANUFACTURER: Veeder Root M12. MODEL #: TLS 350 R <br />M13. <br />LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL #(5): 794380-301 <br />M15. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />M17. <br />IN -TANK PROBE MANUFACTURER: M18. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. M23. <br />❑x 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑x b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6.VISUAL MONITORING: ❑ a. DAILY ❑ b. WEEKLY <br />❑ 99. OTHER (Specify): <br />M28. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />❑x 1. CONTINUOUS MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑x b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M31. <br />PANEL MANUFACTURER: Veeder Root M32. MODEL #: TLS 350 R <br />M33. <br />LEAK SENSOR MANUFACTURER: Veeder Root M34. MODEL #(S): 794380-208 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑x a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑x a. YES ❑ b. NO <br />M37. <br />❑x 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s): F. E. Petro M38. MODEL #(5): STP -MLD/ STP -MLD -D <br />M39. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER(s): Moo. MODEL #(S): <br />M41. <br />PROGRAMMED IN LINE TESTING: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. M46. <br />❑ 5. VISUAL MONITORING: ❑ a. DAILY ❑ b. WEEKLYI-I c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />M47. <br />• Allowe or monitoring of unburied emergency generator fuel piping only per HSC §25281.5(b) <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR §2636(a)(3) (3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />hwfwrc-d (9/24/04) - 1/4 <br />