My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2006 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2018 2:32:22 PM
Creation date
9/7/2018 2:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2006 - 2008
FileName_PostFix
2006 - 2008
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/12/2007 09:10 9163712450 EZ htANITANENCE PAGE 02/02 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br />1, Site map enclosed YES [ I NOY <br />2. Manufacturer's spec sheets attached for all equipment to be installed YES [ NO [ J <br />3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pa es 4-8 as necessary fora timely plan review): <br />'ID.nr"kr.erX IiC1, •Tf"%1ht\n �.kK1TN:n iAI �1n1a/J,.-r. . Ut- - ')IAr-- n (16)TAnnr% <br />4. Description of equlprr�,ent to be used (Attach drgwiogs/blueprints as necessary): <br />5. All equipment is State certified or approved. YES [X NO [ I <br />6. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address _ <br />c. Describe method to be used for decontamination: <br />YES [ I NO <br />Phone(_) <br />City 7_ip <br />d, Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e, Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone(_) Hauler Reg#_ <br />Address City Zip <br />Permitted Disposal Site <br />7. a. Describe the method that will be utilized to purge and/or inert the piping: <br />b. Piping Hauler: <br />Name Phone( ) <br />Address City Zip <br />Hauler Registration # (if hauled as hazardous) <br />c. Piping Disposal Site: <br />Name_ . _ ... _ Phone <br />Address City Zip <br />EPA ID# (if transported to a permitted TSD facility) <br />8. Is the sampling firm an independent third party from the contractor? YES [ I NO [ I <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained.- <br />10, <br />btained: <br />10, Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler). <br />Name Hauler Registration # Phone ( ) <br />Address —C it Zlp, <br />b) If soil is not to be hauled, describe what will be done with it: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.