My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2006 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2018 2:32:22 PM
Creation date
9/7/2018 2:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2006 - 2008
FileName_PostFix
2006 - 2008
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M50. <br />Q 1. CONTINUOUS MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: Veeder Root 1051. MODEL #: TLS 350 R M52. <br />LEAK SENSOR MANUFACTURER: Veeder Root M53. MODEL #(S): 794380-208 M54. <br />WILL DETECTION OF A LEAK IN THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? X❑ a. YES F] b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN?x❑ a. YES b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. YES b. NO M57. <br />2. MECHANICAL CONTINUOS MONITORING (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />MANUFACTURER: Mss. MODEL #(S): M59. <br />3.VISUAL MONITORING DONE: R a. DAILY ❑ b. WEEKLY M60. <br />4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M61. <br />VII. ENHANCED LEAK DETECTION <br />1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST PERFORM ENHANCED LEAK 70' <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that appy Mao. <br />1. Fx THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. X THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of January 1, 2005) <br />4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND STATISTICAL INVENTORY <br />RECONCILIATION" <br />7. SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99C] OTHER (Specify): Mal. <br />Personnel with UST monitoring responsibilitiesfamiliar s when <br />needed. By January 1, 2005, this facility will have a "Designated UST Operator" who has passed the California UST Sytem Operator Exam administered by the <br />International Code Council (ICC). By July 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and <br />maintenance of the UST systems. This training will include, but is not limited to, the following: <br />O Operation of the UST systems in a manner consistent with the facility's best management <br />practices. O The facility employee's role with regard to the leak detection equipment. <br />© The facility employee's role with regard to spills and overfills. <br />O Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2005, the initial training will be conducted within 30 days of the date of <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional system monitoring -related information e.g., additional information required by your local Mas. <br />agency): <br />X. PERSONNEL RESPONSIBILITIES <br />"DIESK3 <br />AS OF JANUARY 1, ZOU5, I HL OR" IDENTIFIED IN SE( -TION III OFTHECURRENT L15TOPERAIINU PLRIVIII APPLICATION -FACILITY FORM <br />WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN TITLE <br />23 CCR § 2715(c), AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH TITLE <br />23 CCR § 2715(c). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />OWNER/OPERATOR SIGNATURE REPRESENTING <br />ATE: M91. <br />r _ [x Owner M9o. <br />09/27/07 <br />Cf Operator <br />' <br />OWNER/OPERATOR TITLE: ' <br />OWNER/OPERATOR NAME (print): Daniel A Erickson <br />Compliance Manager <br />(Agency Use Only) This plan has been reviewed Approved Approved With Conditions E] Disapproved <br />and: <br />Local Agency Signature: Date: <br />Comments/Special Conditions: <br />hwfwrc-d (9/24/04) - 3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.