My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:28:59 PM
Creation date
9/7/2018 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL_2006
FileName_PostFix
2006
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br />NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: ADDRESS: <br />PR # TANK# UL# TANK MODEL/MATERIAL: <br />COMPARTMENTALIZED TANK? (If yes, complete one form for each tank) ❑ YES ❑ NO <br />TANK CAPACITY: PRODUCT: <br />DATE A INITIALS <br />P <br />P <br />R ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE WITH MANUFACTURER WRITTEN <br />° SPECIFICATIONS <br />E <br />0 <br />I I I 1 1. UST PLANS SUBMITTED AND FEES PAID !H&S CODE SECTION 252R71 I <br />2. <br />INITIAL INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY TEST: VACUUM: <br />SOAP: PSI: HRS/MIN: BRINE LIQUID ANNULAR): OTHER: <br />4. PRIMARY TANK TEST: <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL API/PEI <br />PIPIN(. INSPFrTInNS <br />4•L4 -e6 <br />W.Wi <br />6. PRIMARY PIPING TEST MINIMUM 40 PSI/30 MIN <br />CCR 2636(e)] <br />u -off <br />.NC, <br />7. SECONDARY PIPING CONTAINMENT TEST: PSI: `"r HRS/MIN: 1.O <br />OTHER: CCR 2636 e <br />9.21•ub ✓ <br />.Nf- <br />8. LAKE TEST ON ALL SUMPS 24 HR MINIMUM -LHRS: <br />FCCR 2635 a 4 <br />�+ u °b ✓ <br />w• M^ <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />OVERFILL PROTECTION INSTALLED AND APPROVED <br />CCR 2635 b 2 <br />10. OVERSPILL PERFORMANCE TEST <br />FCCR 2635 b 1 C <br />4•4.0la / <br />w..JL, 1 <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED <br />FCCR 2636(b)] <br />t►•ob ✓ <br />W N!(^ 1 <br />12. PIPING SLOPES TO COLLECTION SUMP <br />FCCR 2636 c 1 <br />f � 1 � ��T>■T�G� �3�i �iTiT�l <br />13. <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />CCR 2632 c 2 <br />14. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM <br />FCCR 2632 c 2 <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />ICCR 2643 c 1 <br />16. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT OFF <br />CCR 2636 <br />17. <br />BALL FLOAT VALVES INSTALLED <br />18. <br />OVERFILL PROTECTION INSTALLED AND APPROVED <br />CCR 2635 b 2 <br />19. TANK ACCESS PORTS BROUGHT TO GRADE LOCKED AND WATERTIGHT <br />API <br />20. <br />TANK INTEGRITY TEST PERFORMED HARD COPY SUBMITTED <br />CCR 2635 a 5 <br />21. <br />MONITORING PLAN RESPONSE PLAN AND LOG BOOK ON SITE <br />CCR 2632 d <br />22, <br />"C" FORM COMPLETED AND SUBMITTED <br />CCR 2635' d <br />23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />CCR 2630-2636 <br />24. ALL CONDITIONS MET: FACILITY PERMIT ISSUED <br />(H&S CODE 25284) <br />COMMENTS <br />EH23 006 3/18/02 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.