Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM •. 1 <br />TANKS <br />UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br />Page � of <br />V1. PIPING CONSTRUCTION (Check all that apply) <br />UNDERGROUND PIPING ABOVEGROUND PIPING <br />SYSTEM TYPE "5(l. PRESSURE [:12. SUCTION ❑ 3. GRAVITY 458. ❑ 1. PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY 459. <br />CONSTRUCTION/ ❑ 1. SINGLE WALL ❑ 3. LINED TRENCH [199. OTHER 460. ❑ 1. SINGLE WALL ❑ 95. UNKNOWN 462. <br />MANUFACTURER `J(2 DOUBLE WALL ❑ 95. UNKNOWN ❑ 2. DOUBLE WALL ❑ 99. OTHER <br />MANUFACTURER SIM(ix 't6A%GP"ST 46i. I MANUFACTURER 463. <br />❑ 1. BARE STEEL % 6. FRP COMPATIBLE W/100% METHANOL ❑ 1. BARE STEEL ❑ 6. FRP COMPATIBLE W/100% METHANOL <br />❑ 2. STAINLESS STEEL [17. GALVANIZED STEEL ❑ 2. STAINLESS STEEL ❑ 7. GALVANIZED STEEL <br />rI 3. PLASTIC COMPATIBLE WITH CONTENTS ❑ 95. UNKNOWN ❑ 3. PLASTIC COMPATIBLE W/ CONTENTS ❑ 8. FLEXIBLE (HDPE) [199. OTHER <br />i. FIBERGLASS ❑ 8. FLEXIBLE (HDPE) ❑ 99. OTHER ❑ 4. FIBERGLASS ❑ 9. CATHODIC PROTECTION <br />❑ S. STEEL W/COATING [19. CATHODIC PROTECTION 464. ❑ S. STEEL W/COATING ❑ 95. UNKNOWN 465. <br />VII. PIPING LEAK DETECTION (Check all that apply) (A descri tionof the monitoring program shall be submitted to the local agency.) <br />UNDERGROUND PIPING ABOVEGROUND PIPING <br />SINGLE WALL PIPING 466. SINGLE WALL PIPING 467. <br />PRESSURIZED PIPING (Check all that apply): PRESSURIZED PIPING (Check all that apply): <br />❑ I. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br />SHUT-OFF FOR LEAK, SYSTEM FAILURE, AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK, SYSTEM FAILURE, AND SYSTEM DISCONNECTION <br />+ AUDIBLE AND VISUAL ALARMS. + AUDIBLE AND VISUAL ALARMS. <br />❑ 2. MONTHLY 0.2 GPH TEST ❑ 2. MONTHLY 0.2 GPH TEST <br />❑ 3. ANNUAL INTEGRITY TEST (0.1 GPH) ❑ 3. ANNUAL INTEGRITY TEST (0.1 GPH) <br />❑ 4. DAILY VISUAL CHECK <br />CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS (Check all that apply) <br />❑ 5. DAILY VISUAL MONITORING OF PUMPING SYSTEM + TRIENNIAL PIPING ❑ 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br />INTEGRITY TEST (0.1 GPH) <br />SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST (0.1 GPH) <br />[17. SELF MONITORING SAFE SUCTION SYSTEMS (NO VALVES IN BELOW GROUND PIPING): <br />GRAVITY FLOW [17. SELF MONITORING <br />[19. BIENNIAL INTEGRITY TEST (0.1 GPH) GRAVITY FLOW (Check all that apply): <br />[18. DAILY VISUAL MONITORING <br />[19. BIENNIAL INTEGRITY TEST (0.1 GPH) <br />SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br />PRESSURIZED PIPING (Check all that apply): PRESSURIZED PIPING (Check a0 that apply): <br />10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br />ALARMS AND (Check one) ALARMS AND (Check one) <br />❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br />-gb. AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM ❑ b. AUTO PUMP SHUT OFF FOR LEAKS, SYSTEM FAILURE AND SYSTEM <br />DISCONNECTION DISCONNECTION <br />❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUTOFF <br />❑ <br />11. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITH FLOW SHUT ❑ 11. AUTOMATIC LEAK DETECTOR <br />OFF OR RESTRICTION <br />❑ <br />12. ANNUAL INTEGRITY TEST (0.1 GPH) ❑ 12. ANNUAL INTEGRITY TEST (0.1 GPH) <br />SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br />❑ 13. CONTINUOUS SUMP SENSOR+ AUDIBLE AND VISUAL ALARMS [113. CONTINUOUS SUMP SENSOR+ AUDIBLE AND VISUAL ALARMS <br />EMERGENCY GENERATORS ONLY (Check all that apply) EMERGENCY GENERATORS ONLY (Check all that apply) <br />[314. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br />AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br />C:115. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) <br />SHUT OFF OR RESTRICTION <br />❑ <br />16. ANNUAL INTEGRITY TEST (0.1 GPH) ❑ 16. ANNUAL INTEGRITY TEST (0.1 GPH) <br />[117. DAILY VISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br />VIII. DISPENSER CONTAINMENT <br />DISPENSER CONTAINMENT 468. []1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑ 4. DAILY VISUAL CHECK 469. <br />DATE INSTALLED ❑ 2. CONTINUOUS DISPENSER PAN SENSOR + AUDIBLE AND VISUAL ALARMS ❑ 5. TRENCH/LINER MONITORING <br />g2l. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑ 6. NONE <br />DISPENSER + AUDIBLE AND VISUAL ALARMS <br />IX. OWNER/OPERATOR SIGNATURE <br />I certify that the in ormation provided herein is true and accurate to the best of my knowledge. <br />SIGNATURE OF OPERATOR DATE: 470. <br />�, �� d� <br />472. <br />NAME N �PE TITtKZ�O BATOR: <br />Pemrit Number (Agency use only) 473. Pernnt Approved By (Agency use only) 474. Permit Expiration Date (Agency use only) 475. <br />UPCF hwfwrc-b (1/99) - 3/4 http://www.unidocs.org Rev. 02/16/00 <br />