Laserfiche WebLink
Prepared by David Rabb Tracer Research QA <br />Approved by Randy Golding Traces Tzoisa <br />Guideline No 10 Rev 1 Date 03110/03 Field Guideline V-2 <br />1 . lastaallation Guidelines <br />1.1 Installations must follow these guidelines/procedures and the construction drawings. The <br />sampling technician before approval of the instal ation will locate, map, and verify depths of <br />all HSP. Any deviation will delay the project. <br />1.2 All HSP's must be free of defects. It is important that the sampling technician can move the <br />sampling tools throughout the HSP without refusal. If he encounters a refusal, vertical probes <br />drilled through, the concrete will become necessary. - <br />13 Always replace the probe caps when not in use. Having gravel enter the HSP will create an <br />impasse. <br />1.4 Aiways use Tracer Tight® parts. These parts are needed to allow the tooling access to the <br />HSP. <br />1-5 Be sure you have the ground water data Installing the HSP underwater will result in having <br />to abandon the HSP and installing vertical probes which will delay the project. <br />1.6 If you are not sure what to do, contact a Tracer Tighter technician at. 520-888-9400 Ex.t250 <br />2 Supplies <br />2.1 Pull boxes <br />22 Construction drawings of the sampling system (by owner) <br />23 Horizontal Sampling Probes (HSP) <br />23.1 20fr HSP <br />2.3-2 Connections <br />2.33 90? sweeps <br />23.1 45? weeps <br />2.3.5 Couplings <br />2.3.6 Probe cis aril assemblies <br />2 3.7 1 Cr =.. Icsicn =of i e <br />2.4 Mand tools, oiLe cutter. PVC cement, Shovel, plcic <br />2.6 Gra ="ee 430 poly line <br />3 Pr oeedu e for TriacerTL:;ht Horizontal Sampling Probes (Hs --P) <br />3.1 Collect necessary supplies. <br />32 Be sure you are awan of what the maximum high ground water level is. <br />33 Inspect tank area accounting for all utilities and tank features such as sumps, underground <br />pipes and electrical systems and aboveground obstructions such as pipes and berms. Review <br />construction drawing to make sure that all features are accounted for. <br />3.4 BacIM tanks to the crown with the appropriate gravel. <br />3S From the construction drawings provided, install the sampling system layout around the tank's <br />for optimal ease of installation and safety. The HSP must not exceed a distance of more than <br />18 inches from the vertical edge on each side of each tank. <br />3.6 Always turn the perforated side of the HSP down. <br />3.7 Installation notes <br />3.71 Piping <br />3.7.1.1 Each piping trench must have a llSP included in the gravel bac dill of that <br />trench. <br />= liJrOR&L47701V !S PROPERT7OF?2L 41R SE'RnCZ QVC AND tkMY,(OT 3ETR,LVSiI,=-D. COPS OR DISCLOSED, !N <br />rFKOLY OR (/ PART, 5. ZnCl Dic. <br />7 ural Sup For t`fCL D Horizontai ?mi)�- `i-2 <br />