Laserfiche WebLink
Yes No Comment <br />Generation Points ("Satellite Accumulation") <br />(Reference 25123.3 and 66262.34(e)) <br />Has the generator accumulated HW at or near the <br />point of initial generation without meeting <br />storage deadlines provided they accumulate no more <br />than *55 gallons of HW or one quart of acutely or <br />extremely HW, and: [66262.34(e)(1)-] <br />(A) The waste is accLMTlated in containers at or <br />near the area where generated and which is under <br />the control of the operator of the process? — <br />(B) The waste is held on-site for no more than <br />one year, nor more than 90 days from reaching <br />applicable quantity limits? — <br />(C) The initial date of accumulation is clearly <br />marked and visible for inspection on each <br />container? — <br />(D) The HW is compatible with the container used <br />for accimmlation and the container is kept closed <br />except when necessary to add or remove waste? — — <br />(E) The generator complies with <br />66262.34(e) (2), (3) and (f) (3)? <br />* Note: If the generator has determined that not all wastestreams generated by a single <br />process or group of processes in the same physical area are compatible, the generator may <br />apply a separate 55 gal. or 1 qt. limit to each group of compatible wastestreams. <br />(Reference 66262.34(e)(2)(A)) <br />Also, if the generator determines that using only one 55 gal. or 1 qt. container to <br />initially accumulate specific compatible wastestreams is not practical or safe, the <br />generator may use a separate container for those specific compatible wastestreams <br />(although this determination is subject to review and approval by the Department at any <br />time). (Reference 66262.34(e)(2)(b)) <br />Once the generator has accumulated an amount of HW <br />equal to any applicable quantity limitation listed <br />in 66262.34(e)(1), has the generator, with respect <br />to that waste, within three days, labelled the <br />container with the date the quantity limit was <br />reached and complied with 66262.34(a)? <br />[66262.34(e)(3)] <br />90 Day Accumulation <br />(Section 66262.34) <br />If the generator does not have a permit or interim <br />status (as a TSD facility) have they accumulated <br />HW on-site for less than 90 days (except as <br />provided under 66262.34(d))? [66262.34(a)] <br />NOTE: For generators of not more than 100 kg/mo. of HW nor 1 kg/mo. of acute or extremely <br />HW, the 90 day period begins on the date the generator has accumulated 100 kg (or 1 kg). <br />(Reference 66262.34(b) and 25123.3(b)) <br />Revised 7/15/91 Page 4 <br />