Laserfiche WebLink
I SEMCO 1* <br />ENVIRONMENTAL & GENERAL ENGINEERING CONTRACTORS <br />LICENSE #449864 A, B, C61/D40 <br />1217 S. 7TH STREET, MODESTO, CALIFORNIA 95351 <br />(209) 524-9653 FAX# (209) 524-0503 <br />December 9, 1993 <br />Mr. Michael P. Kith, R.E.H.S. <br />San Joaquin County Public Health Services <br />Environmental Health Division <br />P.O. Box 2009 <br />Stockton, CA 95201-2009 <br />Subject: Allocation of Fees <br />Reference: Madsen's Sunrise Dairy <br />239 So. Stockton Street <br />Ripon, CA 95366 <br />Dear Michael, <br />Pending your department's review and approval, we hope to commence <br />work at the Madsen's location in December 1993. The tank and other <br />equipment for the job have been constructed or are secured. We <br />don't anticipate final inspections to be ready until mid to late <br />January 1994. <br />We request on behalf of the Madsens that the operating fees <br />submitted be carried over to satisfy the 1994 requirement. Thanks <br />for your assistance in this matter. <br />If I may be of further help in providing information or materials <br />for the installation plans, please call me at 209-524-9653. <br />Sincerely Yours, <br />Richard Hamilton <br />vice President <br />CC: Mr. Robert Madsen <br />0 0 <br />