My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 4:57:02 PM
Creation date
9/12/2018 4:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1994-2010
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIWpTY ENVIRONMENTAL HEALTHAWARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION 1. NEW PLAN <br />PLAN TYPE❑ 2. CHANGE OF INFORMATION <br />-❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />FACILITY ID # (Agency Use Only) 1. FACILITY INFORMATION <br />rACILITY NAME I I �.-� � <br />et.1 <br />FACILITY SITE ADDRESS p t51 <br />II. EQUIPM <br />State law requires that testing, preventive maintem <br />accordance with the equipment manufacturers' inst <br />MONITORING EQUIPMENT IS SERVICED <br />This monitoring plan m <br />line leak detector, monitust include a Site Plan show <br />oring system control panel, <br />form- Ha -d...... a_.- - - . _. <br />and ca <br />Ins, or <br />III. <br />tin.Dh <br />----••• •^s w��P���=��� I, g., sensors, probes, line leak detectors, -etc.) be perform <br />I whichever is more frequent. Such work must be performed by qualified personnel. <br />I. ANNUALLY ❑ 99.OTHERS OTHER(Specify) <br />(P fY): <br />1ITORING LOCATIONS <br />eneral tank and plp <br />You already have a <br />current UST Monitoring Site <br />M07. <br />----- • ....a„ml ur each sensor, <br />from a Monitoring System Certification <br />rLEAK <br />MSENSOR <br />ED USING THE FOLLOWING METHK MONITORING <br />�IICCK all that apply) <br />RONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />NTAINMENT IS: �a. DRY ❑ b. LIQUID FILLED <br />CTURER: n " ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />ANUFACTURER:n Mlz. MODEL#: <br />S`"�L-fir . <br />El 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE W_ ALL M 1 MODEL#(S): <br />TgNKIS1 <br />PANEL MANUFACTURER: <br />. <br />IN -TANK PROBE MANUFACTURER: <br />M16 \41 9, MODEL #: MODEL #(S): <br />LEAK TEST FREQUENCY: EDa. CONTINUOUS - <br />❑ d. MONTHLY ❑ b. OTHERDAILYRIGHTLY ❑ c. WEEKLY <br />PROGRAMMED TESTS: ❑ e. OTHER IS a 'C <br />MI1. <br />M13. <br />MIS <br />Mn. <br />M19. <br />M20 <br />LVISUALMONITORfNG <br />ORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 P Cl y) ML. M23. <br />MANUAL TANK GAUGING (MTG) PER 23 CCR §2645❑ b. STATISTICAL PER 23 CCR §2646.1 M±4ING PERIOD: ❑ a. 36 HOURS <br />❑ b. 60 HOURS M25. <br />TY TESTING PER 23 CCR §2643.1 <br />FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER(Specify): M26. M,ZONITORING DONE: '1'a.DAILY ❑ b. WEEKLY(aequlm agency app,...ab (Specify): <br />M28. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHODS) (Check all that apply) <br />El M30. <br />L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES)AtuD OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑ b. LIQUID FILLED ❑ C. UNDER PRESSURE ❑ d. UNDER VACUUM M31. <br />PANEL MANUFACTURER: M32. MODEL #: M33. <br />LEAK SENSOR MANUFACTURER: Mia MODEL #(S): Mas. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? El a. YES El b. NO M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M32 <br />❑ 2, MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />rRoaucr Pt.OW WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s): Mae. MODEL #(S): M39. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: M40. MODEL #: M41. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 <br />g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. Msz. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />❑ a. YES ❑ b. NO Mai. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ <br />Ela. YES 4. INTEGRITY TESTING ❑ b. NO M44. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. M46. <br />❑ <br />5 -VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY' ❑ C. MM. MONTHLY & EACH TIME SYSTEM OPERATED" Mar. <br />or <br />6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FORYEXEMPTION FROM MONITORING PER 23 CCRe 26361a(piping only per HSC §252815(b)(3) <br />)(3) NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) § O(3 ) <br />❑ 99. OTHER (Specify) <br />M43. <br />SJCEHD-d (07/03) -1/4 <br />07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.