My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
320
>
2300 - Underground Storage Tank Program
>
PR0231481
>
REMOVAL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 5:10:15 PM
Creation date
9/12/2018 5:00:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1994
FileName_PostFix
1994
RECORD_ID
PR0231481
PE
2381
FACILITY_ID
FA0003931
FACILITY_NAME
RIPON MILLING CO
STREET_NUMBER
320
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25929015
CURRENT_STATUS
02
SITE_LOCATION
320 S STOCKTON AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />1., COMMUNITY DEVELMWENT DEPARTMENT <br />1610 E HAZELTON AVE. STOWON. CA 95205 <br />rte'+ DEVELOPMENT SERVICES PHONE 12091 489.7120 <br />PLANNtxi PHONE 12091 4650120 <br />BU9.OWG PHONE: 12091463-3123 <br />NEIGH80RHOOD PRESERVATION PHONE, 12091 4657021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location 120 S- 57 /7 /'°�^� (4 <br />owner Phone No. Z�S 599 �ZG <br />Contractor, S�''10� Phone No.Vq-5Z<4'?653 License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />✓ 2. Submission of verification, e.g. load ticket, within 30 days of project <br />icompletion that one of the following materials was placed, in the excavation in <br />12" lifter <br />A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />Inch in diameter. <br />_ B. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanke/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />Name (Print) <br />tle(P* r n ) <br />(te{ <br />Signature <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.