My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2900 - Site Mitigation Program
>
PR0518418
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 2:56:04 PM
Creation date
9/13/2018 2:50:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518418
PE
2951
FACILITY_ID
FA0013896
FACILITY_NAME
WLM
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`"Now <br />GROUND ZERO ANALYSIS, INC. <br />Quality Control/Quality Assurance Plan <br />5.2 Chain Of Custody Record And Sample Analysis Request Form <br />A chain of custody record for each container or sample will be used to track possession of the <br />samples from the time they were collected in the field until the time they are analyzed in the <br />laboratory. <br />The chain of custody record will contain the following information: <br />1. Site Name <br />2. Signature of collector <br />3. Date and time of collection <br />4. Sample identification number(s) <br />5. Number of containers in sample set <br />6. Description of sample and container(s) <br />7. Name and signature of persons, and the companies <br />represent, who are involved in the chain of possession <br />8. Inclusive dates and times of possession <br />9. Requested analysis for each sample <br />5.3 Delivery Of Samples To Laboratory <br />or agencies they <br />Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to <br />approximately 4C for shipping. Shipping containers will be sealed with security tape to assure <br />sample integrity during shipping. Delivered samples will be accompanied by a chain of custody <br />record. The laboratory shall note on the chain of custody that samples were properly preserved and <br />security tape was intact upon arrival. <br />6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br />All equipment used for drilling and sampling will be decontaminated prior to use. All equipment <br />used for collection of more than one sample, such as bailers and spoons, will be decontaminated <br />between each use to prevent cross contamination between samples. Drilling equipment will be <br />decontaminated prior to commencing drilling at each hole. Well construction materials will be <br />cleaned as necessary, prior to installation. <br />Equipment and well material decontamination will be conducted on an impermeable surface and all <br />decontamination effluent will be contained. All surfaces of the equipment will be thoroughly <br />decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air <br />drying. The decontamination water will be stored in containers certified for hazardous materials <br />storage and disposed of in an approved manner. <br />Sample equipment to be used for pesticides and organic analysis will be washed in a nonphosphate <br />detergent (Alconox or equivalent) and rinsed with tap water and deionized water. <br />G AData\GROUNDZE\QAQC\QAQC. doe <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.