Laserfiche WebLink
GROUND ZERO ANALYSIS, INC. Quality Control/Quality Assurance Plan <br />for purgeable and semivolatile hydrocarbons analyses are shown on Table 2. <br />9.0 GROUNDWATER MONITORING PROTOCOL <br />Monitoring of depth to water and free phase LNAPL (light non -aqueous phase liquids) thickness <br />within wells will be conducted using an interface probe or conductivity meter. For consistency, all <br />measurements will be taken from the north side of the wellhead at the survey mark. To assess <br />potential infiltration of fine grained sediments, total well depth will also be sounded. <br />Thickness of LNAPL on the groundwater surface is calculated by subtracting the depth to product <br />from the depth to water. In addition, water elevations are adjusted for the presence of fuel with the <br />following calculation: <br />(LNAPL Thickness)(specific gravity) + (Water Elevation) = Corrected Water Elevation <br />Newly installed wells will be allowed to stabilize for 24 hours after development prior to free phase <br />thickness determination. <br />An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br />sheen (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br />sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br />To reduce the potential for cross contamination between wells, the monitoring will take place in <br />order from the least to most contaminated, if known. Well containing free product will be <br />monitored last. Between each well monitoring the equipment will be decontaminated. <br />Water level data collected from the wells will be used to develop a groundwater contour map for <br />the project site. Groundwater flow will be estimated to be perpendicular to equipotential lines <br />drawn on the map. <br />10.0 WELL DEVELOPMENT PROTOCOL <br />Groundwater monitoring wells will be surged and developed prior to sampling activities. <br />Approximately 10 times the volume of water in the casing will be withdrawn if possible. <br />If the aquifer is slow to recharge, development will continue until recharge is too slow to practically <br />continue. The volume of water produced versus time will be recorded. All purged groundwater <br />will be stored on-site in 55 gallon waste drums unless permission is granted by the appropriate <br />regulatory agency to discharge the water to the ground surface or sanitary sewer. Drummed water <br />will be labeled with the source of the water to help ensure appropriate disposal based on <br />contamination levels. <br />G AData\GROUNDZE\QAQC\QAQC. doe <br />5 <br />