My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2800 - Aboveground Petroleum Storage Program
>
PR0527887
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 2:03:48 PM
Creation date
9/14/2018 1:15:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527887
PE
2831
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Unified Grocers, Inc 1990 N PICCOLI RD. STOCKTON November 23 2015 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 722 CFR 112.8(d)(1) Failed to take corrective action on buried piping when exposed for any reason ❑V ❑R ❑COS <br /> 723 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping ❑V ❑R ❑COS <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ■V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE) missing or incomplete. <br /> The Professional Engineer (PE) certification is conditional upon corrections that have not been made. The PE <br /> certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is familiar with 40 <br /> CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and Countermeasure <br /> (SPCC) Plan has been prepared in accordance with good engineering practice, including consideration of applicable <br /> industry standards. procedures have been established for required inspections and testing, and the Plan is adequate <br /> for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. Submit a copy of the <br /> completed certification to the EHD. <br /> This is a Class II violation. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> A 500 gallon used oil tank was removed from the facility approximately 3 years ago and a 360 gallon used oil tank was <br /> installed at the facility approximately 3 years ago. The Plan was not amended to include these changes. The Spill <br /> Prevention, Control, and Countermeasure (SPCC) Plan must be amended when there is a change in the facility <br /> design, construction, operation, or maintenance that materially affects its potential for a discharge, within 6 months of <br /> the change, and implemented as soon as possible. not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> This is a repeat violation, Class II. <br /> Received by Inspector: Phone: Date: <br /> (initial): STACY RIVERA, Senior REHS (209) 468-3440 11/23/2015 <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.