Laserfiche WebLink
i <br /> SUPERVALU INC . <br /> Stockton Distribution Center <br /> 1990 Piccoli Road <br /> We Deliver Stockton CA 95215 <br /> www. supervalu . com <br /> i <br /> June 6 , 2018 RECEIVE <br /> JUN 1201 $ <br /> Attn : Cesar Ruvalcaba <br /> San Joaquin County ENVIRONMENTAL <br /> Environmental Health Department HEADD TH DEPAPtTMENT <br /> 1868 East Hazelton Avenue <br /> Stockton , CA, 95205-6232 <br /> Re : Response to Aboveground Petroleum Storage Act (ASPA) Inspection Report Conducted on <br /> November 23 , 2015 at Unified Grocers , Inc . — Stockton Distribution Center <br /> Dear Mr . Ruvalcaba , <br /> The intent of this letter is to address the findings from the Aboveground Petroleum Storage Act inspection <br /> report conducted on November 23 , 2015 and to inform you of our revised Spill Prevention Control and <br /> Countermeasures ( SPCC ) Plan . We have conducted an evaluation of the petroleum and qualifying products , <br /> in eligible quantities , and determined that this facility should be managed as a self-certifying facility . The Tier <br /> I Qualified Facility SPCC Plan Template as provided by Federal EPA is enclosed with this response . <br /> Statement Documenting Corrective Actions per Inspection Report <br /> Original violation numbers are noted in parenthesis . <br /> Item 201 - Plan certification by a Professional Engineer ( PE ) missing or incomplete . <br /> We conducted an evaluation of the petroleum and qualifying products , in eligible quantities , and <br /> determined that this facility should be managed as a self-certifying facility, as such Plan certification <br /> by a Professional Engineer ( PE ) is not necessary. <br /> Item 301 - Failed to amend Plan as necessary. <br /> + The 360 gallon used oil tank has been added to the SPCC as required . <br /> Item 601 — Plan that does not follow the sequence specified in this section lacks a cross-referencing <br /> section . <br /> + Tier 1 SPCC plans do not require a cross-referencing section . <br /> Item 602 — Plan lacks approval of management to fully commit the necessary resources to implement <br /> the Plan . <br /> + The SPCC Plan has been reviewed and approved by the General Manager of the site , Glenn King , <br /> Piz 05W709 <br /> FAooa3V 6 <br />