My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2800 - Aboveground Petroleum Storage Program
>
PR0527887
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 2:03:48 PM
Creation date
9/14/2018 1:15:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527887
PE
2831
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 718 (720) - Failed to provide sufficient secondary containment capacity for mobile or portable <br /> containers <br /> ® EPA updated the SPCC rule in 2006 and removed the requirement for sized secondary containment <br /> for mobile refuelers (" dike or catchment basin , of sufficient size to contain the capacity of the largest <br /> compartment or container on a mobile refueler along with enough room to contain <br /> precipitation ") . The requirement for general secondary containment remains in place . The general <br /> secondary containment requirements do not require a specific size or quantity for secondary <br /> containment ; they do require appropriate systems to prevent spilled oil from escaping . Active <br /> systems can be used , such as spill mats , storm drain covers , and dams used to block or prevent the <br /> flow of oil . A spill kit is provided on the mobile refueler to deploy if a spill occurs . <br /> Item 723 (726) - Failed to regularly inspect aboveground valves , piping , and appurtenances <br /> • The aboveground valves , piping , and appurtenances will be inspected and documented on a regular <br /> basis . <br /> If you have any questions regarding this plan please contact Thelma Sass , Risk Control Manager II at (209 ) <br /> 931 -7416 <br /> Regards , <br /> �A <br /> Glenn King <br /> General Manager <br /> Supervalu , Inc . — Stockton Distribution Center <br /> Inc . : Return to Compliance Certification <br /> SPCC Plan <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.