My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2800 - Aboveground Petroleum Storage Program
>
PR0527887
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 2:03:48 PM
Creation date
9/14/2018 1:15:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527887
PE
2831
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for SUPERVALU as of May 181 2018 . <br /> Open violations from November 23 , 2015 inspection <br /> Violation #201 - Plan certification by a Professional Engineer ( PE ) missing or incomplete . <br /> The Professional Engineer ( PE ) certification is conditional upon corrections that have not been made . The PE <br /> certification must include all of the aspects in 40 CFR 112. 3 (d ) ( 1 ) , including attesting that the PE is familiar with 40 <br /> CFR Part 112, he or his agent has visited and examined the facility , the Spill Prevention , Control , and <br /> Countermeasure ( SPCC ) Plan has been prepared in accordance with good engineering practice , including <br /> consideration of applicable industry standards , procedures have been established for required inspections and <br /> testing , and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility' s <br /> SPCC Plan . Submit a copy of the completed certification to the EHD . <br /> Violation #301 - Failed to amend Plan as necessary. <br /> A 500 gallon used oil tank was removed from the facility approximately 3 years ago and a 360 gallon used oil tank <br /> was installed at the facility approximately 3 years ago . The Plan was not amended to include these changes . The <br /> Spill Prevention , Control , and Countermeasure (SPCC ) Plan must be amended when there is a change in the facility <br /> design , construction , operation , or maintenance that materially affects its potential for a discharge , within 6 months o' <br /> the change , and implemented as soon as possible , not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> Violation #601 - Plan that does not follow the sequence specified in this section lacks a cross-referencing <br /> section . <br /> The Spill Prevention , Control , and Countermeasure (SPCC ) Plan does not follow the order of requirements in 40 CFI <br /> Part 112, and the cross- reference provided is incomplete . If you do not follow the sequence specified in 40 CFR 112 <br /> for the Plan , you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan . Immediately amend the SPCC Plan to include a complete <br /> cross-reference or to follow the required sequence . <br /> Violation #602 - Plan lacks approval of management to fully commit the necessary resources to implement <br /> the Plan . <br /> The management approval section was not signed . The Spill Prevention , Control , and Countermeasure (SPCC ) Plar <br /> must have the full approval of management at a level of authority to commit the necessary resources to fully <br /> implement the Plan . Immediately obtain required management approval for the SPCC Plan for this facility. <br /> Violation #603 - No facility diagram or didn 't show location and contents of containers , transfer stations , anc <br /> pipes . <br /> The facility diagram did not show aboveground piping and a refrigeration oil drum at the lube shop . The Spill <br /> Prevention , Control , and Countermeasure (SPCC ) Plan shall include a facility diagram which must mark the location <br /> and contents of each fixed storage container and the storage area where mobile or portable containers are located . <br /> It must identify the location of and mark as "exempt" underground tanks . It must also include all transfer stations an ( <br /> connecting pipes , including intra-facility gathering lines . Immediately update the facility diagram to include all of the <br /> required information . Submit a legible copy of the updated facility diagram to the EHD for review. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.