My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
720
>
2800 - Aboveground Petroleum Storage Program
>
PR0528050
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:46:20 AM
Creation date
9/14/2018 2:34:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528050
PE
2832
FACILITY_ID
FA0014456
STREET_NUMBER
720
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25936028
CURRENT_STATUS
01
SITE_LOCATION
720 S STOCKTON AVE
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br />2016 SPCC Plan Update <br />MAR 2 9 NuCal Foods, Inc. <br />Page 3 <br />MENTAL HEALTH <br />SCHEDULE AND COST ESTIMATE �NV�R�N TMENT <br />pEPAR <br />We are prepared to begin work at the Facility upon receipt of an executed Work Order. Under Task 1, a <br />draft version of the updated SPCC Plan will be submitted to you for review and comment three (3) weeks <br />after the site work has been completed. A final updated SPCC Plan will be submitted to you within two <br />(2) weeks after receipt of your draft SPCC Plan comments and edits. If Task 2 is selected, a Condor <br />representative will coordinate a training session upon finalization of the SPCC Plan. Under Task 3 a <br />summary and recommendations letter will be provided to the Client within three (3) weeks of the site <br />inspection. <br />A breakdown of the estimated costs follows: <br />TASK 1 — SPCC Plan Update ............................... $4,350 <br />TASK 2 — SPCC Annual Personnel Training...............................................................$1,000 <br />TASK 3 — Hazardous Waste Generator Program Support .............. $2.850 <br />TOTAL.....................................................................................................................S-8.200 <br />AUTHORIZATION <br />If this Proposal is acceptable and you would like Condor to proceed with the proposed Scope of Work, we <br />ask that you sign and immediately return a copy of the enclosed Master Services Agreement and the <br />Work Order. Please retain a copy of these documents for your records. <br />CLOSURE <br />We appreciate the opportunity to present this proposal to NuCal Foods, Inc. if you have any questions, <br />please give me a call at 209.938-1047. <br />Respectfully, Reviewed by, <br />CONDOR EARTH TECHNOLOGIES, INC. <br />C e— <br />Jordan Johnson, <br />Environmental Specialist <br />Enclosures: <br />Master Services Agreement dated March 11, 2016 <br />Work Order dated March 11, 2016 <br />X.tProjecV" -.p j%1I4AP NuCal SPCC Plan UpdateContracts_Proposals_CEW 20160311 NuCal Foods Inc -SPCC Plan Updme Propossl docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.