Laserfiche WebLink
Reviewed by Submitted by <br />Eric ioung Kelly C. Brown, PG 6714 <br />Principal Geologist Project Manager <br />Limited Phase II Environmental Site Assessment Report <br />April 2, 2007 <br />Page 4 <br />CONCLUSIONS <br />The purpose of the assessment work was to evaluate the subsurface conditions in the vicinity of <br />the sump to determine if there have been any releases to the environment. No chemical <br />constituents were reported above the LMDL. Therefore, based on the results of this <br />investigation, it does not appear that there has been a release to the environment from past <br />sump operations. <br />If you have any questions or comments regarding this work plan, please contact Mr. Kelly C. <br />Brown at 714.230.0321. <br />Respectfully submitted, <br />SECOR International Incorporated <br />Attachments: Figure 1 — Site Location Map <br />Figure 2 — Site Plan <br />Table 1 — Soil Analytical Data <br />Attachment A — SJCEHD Approved Well Permit Application <br />Attachment B — Standard Operating Procedures <br />Attachment C — Waste Disposal Documentation <br />Attachment D — Boring Log <br />Attachment E — Certified Laboratory Report and Chain-of-Custody <br />Documentation <br />cc: Mr. Carl Roude, Red Mountain Retail Group, Inc. <br />Mr. Phil Clark, Clark Environmental Consulting <br />PJCEC/Stockton/Stockton Limited Phase II ESA Report FINAL 04.02.07 SECOR