My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3702
>
2900 - Site Mitigation Program
>
PR0526832
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 9:11:27 AM
Creation date
9/18/2018 9:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526832
PE
2950
FACILITY_ID
FA0018171
FACILITY_NAME
FORMER WAL-MART STORE #1554
STREET_NUMBER
3702
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
13002010
CURRENT_STATUS
01
SITE_LOCATION
3702 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />Importance: High <br />Hi Margaret, <br />I left Frank the following message regarding the inspection of the soil boring at the Former Wal-Mart Store <br />on Hammer Lane in Stockton. <br />The project geologist says that he does not remember requesting an inspection for the grouting of the soil <br />boring. Therefore, I am going to assume that he never did contact Frank or the SJCEHD to request an <br />inspection. I have informed our Regional Manager (cc'd) of this issue (who resides in the same office in <br />Sacramento) to discuss this issue with the project geologist. <br />In know the quality of work SECOR's Sacramento Office does would meet the SJCEHD requirements for <br />this site in regards to grouting of the soil boring. For your information, on February 5, 2007, one soil boring <br />was drilled by Cascade Drilling using 1.5 inch diameter direct push drilling equipment to 25 feet bgs. Upon <br />completion, the boring was backfilled using bentonite grout, then capped with concrete. Soils encountered <br />were clay, and no groundwater was identified during drilling. Additionally, there were no reported <br />concentrations of any analytes. SECOR submitted a report to the SJCEHD on April 2, 2007. <br />I am hoping that we can resolve this without having to re-drill the location, as this would have an impact the <br />business operations at the site. I know that SJCEHD should have been contacted, and I know that the <br />project geologist is also aware of the required inspection. It is unacceptable that the project geologist did <br />not perform his duties as requested, by both myself and the SJCEHD. <br />I apologize for this mishap, and will work with SECOR's Regional Manager so the project geologist will not <br />forget to request an inspection, whether with SJCEHD or any other agency. <br />If you wish to discuss further, please call me or have Frank call me at any time. <br />Kelly C. Brown, PG <br />Principal Geologist <br />SECOR International Incorporated <br />714.230.0321 direct ph <br />714.470.6494 cell ph <br />12/5/2007
The URL can be used to link to this page
Your browser does not support the video tag.