My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2758
>
2300 - Underground Storage Tank Program
>
PR0541416
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:56:43 PM
Creation date
9/19/2018 8:39:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0541416
PE
2351
FACILITY_ID
FA0023733
FACILITY_NAME
Sunwest Chevron
STREET_NUMBER
2758
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95242
APN
16646031
CURRENT_STATUS
01
SITE_LOCATION
2758 W Kettleman Ln
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility/Site <br />Unwest Chevron <br />UST Tank# CERS ID <br />758 W Kettleman Ln <br />TA0520811 10748068 <br />odi, CA 95242 <br />Tank Info: Installed Date: 4/25/201712:00:00 AM -Tank Use: Motor Vehicle Fueling -Tank <br />Contents: Premium Unleaded -Type Of Tank: Double Wall - Piping Construction: Double. <br />walled <br />ipe Monitoring is Performed Using the Following Method(s) <br />es Continuous Monitoring of Piping Secondary Containment <br />Piping Secondary Containment <br />Panel Manufacturer Leak Sensor Manufacturer <br />Under Vacuum <br />VEEDER ROOT VEEDER ROOT <br />Panel Model # Leak Sensor Model If <br />TLS 350 PLUS 208,304,480 <br />Yes Leak Alarm Triggers Automatic Pump Shutdown <br />¢s Failure/Disconnect Triggers Pump Shutdown <br />Mechanical Line Leak Detector Performs 3 GPH Leak Test <br />MLLD Manufacturer <br />MLLD Model <br />Yes Electronic Line Leak Detector Performs 3 GPH Leak <br />Test <br />ELLD Manufacturer <br />ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br />VEEDER ROOT <br />Yes <br />LLD Model <br />ELLD Failure/Disconnect Triggers Automatic Shutdown <br />PLLD <br />Yes <br />Pipeline Integrity Testing <br />Visual Pipeline Monitoring <br />Pipeline Integrity Testing Frequency <br />Visual Pipeline Monitoring Frequency <br />Suction Piping Meets Exemption Criteria <br />No Regulated Piping Per Health and safety Code, Division 20, Chapter 6.7 Is Connected To The Tank System <br />Other Pipeline Monitoring <br />Under Dispenser Containment (UDC) Monitoring <br />DC Monitoring <br />Detection of Leak into UDC Triggers Audible and Visual Alarms <br />ondnuous <br />Yes <br />UDC Leak Alarm Triggers Automatic Pump Shutdown <br />DC Panel Manufacturer <br />yes <br />VEEDER ROOT <br />Failure/Disconnection of UDC Monitoring system Triggers Automatic Pump Shutdown <br />DC Panel Model # <br />Yes <br />LS 350 PLUS <br />UDC Monitoring Stops Flow of Product at Dispenser <br />DC Leak Sensor Manufacturer <br />EEDER ROOT <br />UDCCanstruction <br />DC Leak Sensor Model <br />Double-walled <br />08,304 <br />UDC Secondary Containment Monitoring <br />Liquid <br />Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br />Yes <br />eriodic System Testing <br />ELD Testing <br />Secondary Containment Testing <br />e$ Spill Bucket Testing <br />Printed on 10/24/2017 11:01 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.