Laserfiche WebLink
acility/Site <br />iunwest Chevron CERS ID <br />.758 W Kettleman Ln 10748068 <br />ad!, CA 95242 Tank IDg: TA0520810 <br />submittal Status <br />abmitted on 10/18/2017 by Fabiola Padilla of Sunwest Chevron (Lodi, CA) <br />ubmittal was Accepted; Processed on 10/18/2017 by Garrett Backus for San Joaquin County Environmental Health <br />:omments by regulator: This UST submittal was accepted by Garrett Backus, REHS, ICC Certified UST Inspector, San Joaquin County Environmental Health Departmen <br />backus@sjcehd.com. The UST information will be verified during the next EHD inspection. <br />ype of Action <br />ype of Action (UST Tank) <br />Riser Pipe Primary Containment <br />Vent Piping Transition Sumps <br />ew Permit <br />Steel <br />Double -walled <br />nil Components Installed <br />acility Information <br />Riser Pi pe Secondary Containment <br />- <br />unwest Chevron <br />Fiberglass <br />Yes Striker Plate/Bottom Protector <br />758 W Kettleman Ln <br />Lodi, CA 95242 <br />Tank Description <br />Tank IDF <br />Date UST System Installed <br />Tank Configuration <br />A0520810 <br />4/25/2017 <br />A Stand-alone Tank <br />Tank Manufacturer <br />Date Existing UST Discovered <br />Number of Compartments in the Unit <br />SI <br />1 <br />Tank Capacity In Gallons <br />Date UST Permanently Closed <br />Additional Description <br />0000 <br />rank Use and Contents <br />Tank Use Tank Contents <br />Motor Vehicle Fueling Regular Unleaded <br />Other Petroleum Contents <br />Other Non -Petroleum Contents <br />Construction <br />Wall <br />Protection <br />Audible/Visual Alarms <br />Ball Float _ <br />Secondary Containment <br />Fiberglass <br />Yes Fill Tube Shut -Off Valve <br />lroduct / Waste Piping Construction <br />iping Construction Primary Containment secondary Containment Piping/Turbine Containment sump <br />rouble -walled Fiberglass Fiberglass Double -walled <br />(ping System Type <br />ressure <br />Vapor Recovery (VR) and Riser / Fill Pipe Piping Construction <br />F Containment Vapor Recovery Primary Containment <br />Riser Pipe Primary Containment <br />Vent Piping Transition Sumps <br />ass Fiberglass <br />Steel <br />Double -walled <br />nil Components Installed <br />ary Containment Vapor Recovery Secondary Containment <br />Riser Pi pe Secondary Containment <br />Yes Spill Bucket <br />ass Fiberglass <br />Fiberglass <br />Yes Striker Plate/Bottom Protector <br />oder Dispenser Containment (UDC) orrosion Protection <br />onstruction Type Construction Material Sacrificial Anode <br />Double -walled Fiberglass Impressed Current <br />es Isolation <br />Printed on 10/24/2017 11:01 AM <br />