Laserfiche WebLink
4. SECONDARY TESTINGt <br />(1) UPON COMPLE-noN OF fffaWARY ejejNa AND BEFORE <br />BACKFILL, TE�5T SECONDARY PIPING AS REQUIRED BY PIPE MANUFACTURER. <br />ABOVEC. GROUND <br />1.) BLACK IRON AND BLACK IRON FrTTINGS. 5ING <br />NALL. GALVANIZED, PIPE IS NOT PERMITTED. <br />PIPING SYSTEMS SHALL. BE TESTED AS FOLLOWS, <br />D. PIPING 'TO BE INSTALLED W1114 THE MINIMUM DEPTHS <br />LISTED BELOW. <br />A. PETROLEUM PIPING TEST PROCEDURE: <br />ALL CROSSOVERS OF <br />PIPING ALL NAVE <br />° MINIMUM <br />BETWEEN PIPES, <br />1® CONTRACTOR SMALL PROVIDE OWNER 48 HOUR NOTICE FOR <br />UST TANK SECTIGNIS <br />F4.0 <br />MINIMUMMIN, <br />AMOUNT OF <br />TESTING AND COMPLY WITH PERMIT CONDITIONS FOR LOCAL <br />PIPE PIPE <br />SURFACE <br />BURIALPEA <br />VEL <br />INSPECTORS.. <br />MANUFACTURER SIP <br />CONDITION <br />DEPTH <br />T 14E TOP <br />OF TN PIPE <br />2, CONFIRM TESTING PROCEDURE ITN LOCAL AGENCIES PRIOR T TESTING. <br />MITN FI '26" <br />UNPAVED <br />17' <br />12" <br />® PRIMARY TETINs <br />RED T14READ IIA <br />PAVED, ASPHALT <br />12" <br />fso <br />(1) UPON COMPLETIONAND BEFORE GLUING, E ISA Y <br />(4" MINIMUM) <br />NAS TO BE INSTALLED PRIOR TO GLUING OF PRIMARY, PRESSURE <br />PAVED, CONCRETE <br />1* <br />5' <br />TESTING NOT TO EXCEED T14E MAXIMUM WORKING PRESSURE OF FUEL <br />(4' MINIMUM) <br />PIPING COMPONENTS. IMPACT VALVES ARE RATED AT 50PSI TESTING TO <br />BE ACCORDING TO PIPE MANUFACTURER'S INSTRUCTIONS. <br />UNPAVED <br />20" <br />14" <br />PAVED, ASPHALT T <br />1 " <br />cr <br />(2) BEFORE APPLYING PRESSURE, V I THE FOLLOWING HAVE BEEN COMPLETEDt <br />(' MINIMUM) <br />PAVED, CONCRETE <br />11' <br />7" <br />VERIFY SHEAR VALVES ARE CLOSED. <br />(' MINIMUM) <br />VERIFY THE BALL VALVE CI-05EST TO THE TURBINE 15 CLOSED. <br />$ THERE E MUST BE � GAUGES (0-1 I) PER <br />Ji"" <br />UNPAVED <br />PAVED, ASPHALT" <br />20" <br />14' <br />14" <br />10" <br />PRODUCT BEING TESTED, <br />(" MINIMUM) <br />PAVED, CONCRETE <br />11' <br />70 <br />() PROCEDURES TO FOLLOW WHEN APPLYING PRESSURES <br />(40 MINIMUM) <br />* MAKE SURE PERSONNEL ARE KEPT AWAY FROM PIPING SYSTEM DURING <br />ANY TIME INITIAL PRESSUR17-ATION IS BEING APPLIED. <br />* APPLY PRESSURE IN 15-20 PSI INTERVALS UNTIL REAC44ING A MAXIMUM <br />OF 0 P51. <br />MARK CRITICAL. PRESURES, ON GAUGES WIT14 ELECTRICAL TAPE AT <br />THE BEGINNING OF EACH TEST, <br />$ AFTER PROVING SYSTEM TIGHTNESS, APPLY 50 PSI PRESSURE, 14OLD FOR <br />E MINUTE, THEN RELEASE PSU Em REPEAT PRESSURIZATION CYCLE <br />A MINIMUM OF () TIMES, <br />UPON COMPLETIONE ABOVE TESTS, KEEP PRESSURE AT" 50 PSI FOR <br />A MINIMUM OF () WOURS. 05SERVEP SSU AUGES FOR ANY LOSS. <br />Y TEM 944OULD BE KEPT AT 20 PSI FOR U TION OF <br />CONSTRUCTIONAND SHALL BE CWECKED FREQUENTLY. <br />FO,I <br />TITLE L PEET, GENERAL NOTES <br />11.0 <br />SITE PLAN <br />F1.1 <br />ENLARGED SITE PLAN <br />F2,0 <br />EQUIPMENT" [..is -1" <br />F3,0 <br />UST TANK SECTIGNIS <br />F4.0 <br />MPD DETAILS <br />F4.1 <br />us -r-- SUMP DETAIL <br />F5,0 <br />DIESEL DETAILS, VENT DETAILS <br />F,0FG,0 <br />TANK 140LD DONNS, PIT DETAILS. <br />F7.0 <br />FUEL SYSTEM MONITORING <br />SAN J A UIN COUNT' <br />ENMRONMENTAL HEALTH DEPARTMENT, <br />1868 P°, HAZEUON AVER <br />TOCKTON, CA 95205 <br />(299) 465-320 <br />,*Approved <br />cl ApprovedMth C nges" See Remarks <br />u Dl zappCc%vt See RC"Owu <br />Remarks <br />Fxi i u—:4 _ <br />rrrdl�0; t"11)" <br />���,°yrssc tlC <br />"� won and �4� ,rot �� Y,S � �F r` dsr R,�g fy Rx� �a "OJ 6I "Is fifes or <br />ii. pro.t' Heol N s. +'c 1 f, 0 k 1 FICC -• <br />u <br />Lcr y IN plg n; r <br />I9�� <br />SITE^� Thmb 1 yor(5 <br />'bola Gra ter <br />>,0n -t ,e <br />F.Ilnrq, F. Gasoo , <br />t r� <br />F. �.. <br />, <br />Toln,,y,fq cPorl^� <br />T <} non P,vk <br />Y,1,1'r r„an i n <br />PROFESSIONAL SEALS: <br />MEMENVAIROMMERAMERVOMMMWRMWWPPPM <br />PROJECT NUMBER: PROJECT DATE' <br />16-010.3 11-2-2016 <br />SHEET CONTENTS: <br />4, <br />GENERAL , i, <br />DETAILS <br />Fli-011111111"11"OK <br />011 <br />