4. SECONDARY TESTINGt
<br />(1) UPON COMPLE-noN OF fffaWARY ejejNa AND BEFORE
<br />BACKFILL, TE�5T SECONDARY PIPING AS REQUIRED BY PIPE MANUFACTURER.
<br />ABOVEC. GROUND
<br />1.) BLACK IRON AND BLACK IRON FrTTINGS. 5ING
<br />NALL. GALVANIZED, PIPE IS NOT PERMITTED.
<br />PIPING SYSTEMS SHALL. BE TESTED AS FOLLOWS,
<br />D. PIPING 'TO BE INSTALLED W1114 THE MINIMUM DEPTHS
<br />LISTED BELOW.
<br />A. PETROLEUM PIPING TEST PROCEDURE:
<br />ALL CROSSOVERS OF
<br />PIPING ALL NAVE
<br />° MINIMUM
<br />BETWEEN PIPES,
<br />1® CONTRACTOR SMALL PROVIDE OWNER 48 HOUR NOTICE FOR
<br />UST TANK SECTIGNIS
<br />F4.0
<br />MINIMUMMIN,
<br />AMOUNT OF
<br />TESTING AND COMPLY WITH PERMIT CONDITIONS FOR LOCAL
<br />PIPE PIPE
<br />SURFACE
<br />BURIALPEA
<br />VEL
<br />INSPECTORS..
<br />MANUFACTURER SIP
<br />CONDITION
<br />DEPTH
<br />T 14E TOP
<br />OF TN PIPE
<br />2, CONFIRM TESTING PROCEDURE ITN LOCAL AGENCIES PRIOR T TESTING.
<br />MITN FI '26"
<br />UNPAVED
<br />17'
<br />12"
<br />® PRIMARY TETINs
<br />RED T14READ IIA
<br />PAVED, ASPHALT
<br />12"
<br />fso
<br />(1) UPON COMPLETIONAND BEFORE GLUING, E ISA Y
<br />(4" MINIMUM)
<br />NAS TO BE INSTALLED PRIOR TO GLUING OF PRIMARY, PRESSURE
<br />PAVED, CONCRETE
<br />1*
<br />5'
<br />TESTING NOT TO EXCEED T14E MAXIMUM WORKING PRESSURE OF FUEL
<br />(4' MINIMUM)
<br />PIPING COMPONENTS. IMPACT VALVES ARE RATED AT 50PSI TESTING TO
<br />BE ACCORDING TO PIPE MANUFACTURER'S INSTRUCTIONS.
<br />UNPAVED
<br />20"
<br />14"
<br />PAVED, ASPHALT T
<br />1 "
<br />cr
<br />(2) BEFORE APPLYING PRESSURE, V I THE FOLLOWING HAVE BEEN COMPLETEDt
<br />(' MINIMUM)
<br />PAVED, CONCRETE
<br />11'
<br />7"
<br />VERIFY SHEAR VALVES ARE CLOSED.
<br />(' MINIMUM)
<br />VERIFY THE BALL VALVE CI-05EST TO THE TURBINE 15 CLOSED.
<br />$ THERE E MUST BE � GAUGES (0-1 I) PER
<br />Ji""
<br />UNPAVED
<br />PAVED, ASPHALT"
<br />20"
<br />14'
<br />14"
<br />10"
<br />PRODUCT BEING TESTED,
<br />(" MINIMUM)
<br />PAVED, CONCRETE
<br />11'
<br />70
<br />() PROCEDURES TO FOLLOW WHEN APPLYING PRESSURES
<br />(40 MINIMUM)
<br />* MAKE SURE PERSONNEL ARE KEPT AWAY FROM PIPING SYSTEM DURING
<br />ANY TIME INITIAL PRESSUR17-ATION IS BEING APPLIED.
<br />* APPLY PRESSURE IN 15-20 PSI INTERVALS UNTIL REAC44ING A MAXIMUM
<br />OF 0 P51.
<br />MARK CRITICAL. PRESURES, ON GAUGES WIT14 ELECTRICAL TAPE AT
<br />THE BEGINNING OF EACH TEST,
<br />$ AFTER PROVING SYSTEM TIGHTNESS, APPLY 50 PSI PRESSURE, 14OLD FOR
<br />E MINUTE, THEN RELEASE PSU Em REPEAT PRESSURIZATION CYCLE
<br />A MINIMUM OF () TIMES,
<br />UPON COMPLETIONE ABOVE TESTS, KEEP PRESSURE AT" 50 PSI FOR
<br />A MINIMUM OF () WOURS. 05SERVEP SSU AUGES FOR ANY LOSS.
<br />Y TEM 944OULD BE KEPT AT 20 PSI FOR U TION OF
<br />CONSTRUCTIONAND SHALL BE CWECKED FREQUENTLY.
<br />FO,I
<br />TITLE L PEET, GENERAL NOTES
<br />11.0
<br />SITE PLAN
<br />F1.1
<br />ENLARGED SITE PLAN
<br />F2,0
<br />EQUIPMENT" [..is -1"
<br />F3,0
<br />UST TANK SECTIGNIS
<br />F4.0
<br />MPD DETAILS
<br />F4.1
<br />us -r-- SUMP DETAIL
<br />F5,0
<br />DIESEL DETAILS, VENT DETAILS
<br />F,0FG,0
<br />TANK 140LD DONNS, PIT DETAILS.
<br />F7.0
<br />FUEL SYSTEM MONITORING
<br />SAN J A UIN COUNT'
<br />ENMRONMENTAL HEALTH DEPARTMENT,
<br />1868 P°, HAZEUON AVER
<br />TOCKTON, CA 95205
<br />(299) 465-320
<br />,*Approved
<br />cl ApprovedMth C nges" See Remarks
<br />u Dl zappCc%vt See RC"Owu
<br />Remarks
<br />Fxi i u—:4 _
<br />rrrdl�0; t"11)"
<br />���,°yrssc tlC
<br />"� won and �4� ,rot �� Y,S � �F r` dsr R,�g fy Rx� �a "OJ 6I "Is fifes or
<br />ii. pro.t' Heol N s. +'c 1 f, 0 k 1 FICC -•
<br />u
<br />Lcr y IN plg n; r
<br />I9��
<br />SITE^� Thmb 1 yor(5
<br />'bola Gra ter
<br />>,0n -t ,e
<br />F.Ilnrq, F. Gasoo ,
<br />t r�
<br />F. �..
<br />,
<br />Toln,,y,fq cPorl^�
<br />T <} non P,vk
<br />Y,1,1'r r„an i n
<br />PROFESSIONAL SEALS:
<br />MEMENVAIROMMERAMERVOMMMWRMWWPPPM
<br />PROJECT NUMBER: PROJECT DATE'
<br />16-010.3 11-2-2016
<br />SHEET CONTENTS:
<br />4,
<br />GENERAL , i,
<br />DETAILS
<br />Fli-011111111"11"OK
<br />011
<br />
|