My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 4:06:05 PM
Creation date
9/19/2018 2:57:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE 1 <br />(One form per facili > <br />TYPE OF ACTION ❑ I. NEW PLAN 2. CHANGE OF INFORMATION Rol. <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) 1. <br />BUSINESS NAME (Same as FACILITY NAME) 3. <br />S T2s <br />BUSINESS SITE ADDRESS 103. <br />BUSINESS SITE CITY 104. <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />• Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br />§66262.11 finds that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />• We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO- <br />R20. <br />R30. <br />R1 1. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R24. <br />R34. <br />RIS. <br />R25- <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IIS//ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME Rao. <br />TITLE ��.0/L //�i�-.J �/�/-�•c�.+.%Lf/-�c'� L-- Rso. <br />NAME R41. <br />TITLE Rsl. <br />NAME Raz. <br />TITLE R52. <br />NAME R43. <br />I TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />�R/ELEASE, <br />❑ 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ©Z. INSPECTION BY QUALIFIED PERSONS ❑ 3. RECALIBRATION OF EQUIPMENT R60. <br />❑ 99. OTHER (Specify): R61. <br />UN -022B - 1/3 www.unidocs.org Rev. 04/02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.