Laserfiche WebLink
SWRCB, January 2002 <br />RECEIVED <br />0CTajff7—Nff <br />Secondary Containment Testing Report <br />For <br />VI R� RENTA <br />LThisform is intendedfor use by contractors performing periodic testing of UST secondary containment appropriate pages ofthisform to report resultsfor all components testedThe comPletedform, written test procedures, anMENT <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />l,'aciIity Name: Toys R Us I Date of Testing: 9/24/2013 <br />Facility Address: 1624 Army Court, Stockton, Ca. 95206 <br />Facility Contact: Tony Evens I Phone: (209) 465-4912 <br />Date Local Agency Was Notified of Testing: 8/26/2013, by Afford -A -Test <br />Name of Local Agency Inspector (f present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-11201ICC #5246802 -UT <br />Manufacturer Trainine <br />Manufacturer Component(s) Date Training Expires <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component Pass <br />Dail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump <br />X <br />❑ <br />❑ <br />❑ <br />❑ 1 <br />❑ <br />❑ <br />1 ❑ <br />Dispenser Sump <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ 1 <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: September 24, 2013 <br />