Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING St NIP "TESTING <br />Htt;tM-U <br />OCT 07 2013 <br />ENVIAONIVIENTAL <br />T <br />Test Method Developed B\: Sump Manufacturer . Industry Standard l Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure Vacuum X Hydrostatic <br />❑ Other (Speer) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />Sun►p # I <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />36" <br />Sump Depth: <br />13%11 <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />10" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />1299 <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested 1 <br />Water Level 13" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />N/A Suction System <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />N/A <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />Test Start Time: <br />8:30 <br />Initial Reading (Rt): <br />001 <br />Test End Time: <br />9:00 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Nlinutes <br />Change in Reading (RF -R►): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />N es <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />Suction System. <br />► If the entire depth of the sump is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />