Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br />U " SAN JOAQUIN COUNTY <br />Q ?, Donna K. Heran, R.E.H.S. <br />" Director 304 East Weber Avenue, Third Floor <br />Al Olsen, R.E.H.S. Stockton, California 95202-2708 <br />CQ1 �FOR�\PProgram Manager Telephone: (209) 468-3420 <br />Laurie A. Cotulla, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />July 24, 2003 <br />Stockton Service Station <br />808 N Union St <br />Stockton CA 95201 <br />RE: Toys R Us 1624 Army Court Stockton CA 95206 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />The permit to install new product piping, dispenser pan and sump at the above referenced location has been approved <br />with the following conditions: <br />Removal Conditions: <br />1. Contact the fire department for their permit requirements. <br />2. Per letter from Stockton Service Station Equipment, piping and sump will be triple rinsed and disposed of as <br />non -hazardous. <br />3. Samples must be taken and analyzed as stated on pages 4 and 5 of the permit application. <br />4. Per permit application, Del -Tech Geotechnical Support Services will perform the soil sampling and Sherwood <br />Laboratory will perform the analytical tests. <br />5. All analytical results must come from a California certified laboratory or this office will not accept <br />them. <br />6. EHD must witness the soil sampling. Contact EHD to arrange this inspection appointment. <br />Installation Conditions: <br />1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for applicable permits. <br />2. A licensed tank tester must perform a tank integrity test and this office must receive results prior to scheduling <br />the final inspection. <br />3. A licensed tank tester must perform a line tightness test and this office must receive results prior to scheduling <br />the final inspection. <br />4. If automatic pump shut down is provided it must satisfy 2636(g) of California Code of Regulations (CCR). If <br />the facility does not satisfy 2636(g) of CCR an annual line tightness test must be performed. <br />7. All piping and connections shall bear a UL label. <br />8. All piping must slope to a containment sump with an audible and visual alarm. <br />9. All metal equipment in contact with backfill must have corrosion protection. <br />10. Overfill prevention must satisfy CCR 2635(b)(2). <br />11. Contact EHD for the following inspections: <br />a. Primary piping <br />b. Secondary piping <br />c. Piping slope <br />d. 24 hour lake test on dispenser pan and sump <br />e. Final inspection <br />12. Any changes in information or scope of work must be submitted to EHD prior to commencing work. <br />13. A final inspection must be performed prior to returning this station to operation. <br />14. Submit an As -Built plan to EHD at the time of the final inspection. Note: A final inspection will not be <br />performed unless the as -built plan is submitted. <br />15. Submit Form B reflecting the repairs made to the underground tank system. <br />