My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J.LD CONSIDER c <br />EFITS OF <br />3'ERC;LASS PIPING.- <br />RED THREAD II double -wan secondly �� �• ' <br />installers meet EPA regulations and protect the environment. <br />with all concentrations of ethanol and <br />methanol, including 100%. <br />Adhesive kits contain epoxy resin <br />and hardener in separate containers, <br />joint cleaner, mixing stick, paint brush, <br />and paper towels. <br />A detailed instruction sheet is also <br />included with each kit. Refer to approp- <br />riate installation bulletin for additional <br />information including cure cycle times. <br />Following these instructions will insure <br />fast and easy assembly of RED THREAD II <br />piping systems. <br />Tapering <br />When RED THREAD II pipe is cut to <br />length on the job site, the cut end must <br />be retapered. A field tapering tool avail- <br />able from Smith Fiberglass Products is <br />used for this purpose. The tool quickly <br />applies the proper taper by a shaving <br />operation — similar to a pencil shar- <br />pener. Plain unthreaded field -made <br />tapers can be joined with factory - <br />installed threaded T.A.B. joint coupled <br />ends. Either factory -made T.A.B. spigots <br />or field -made tapers may be joined with <br />Jy <br />When the termination concentric reclucer <br />sump, the complete system will be pressure testable. <br />High <br />Flow Capacity <br />RED THREAD II pipe has a greater <br />flow capacity than many other pipes <br />with the same O.D. This is because its <br />high-strength, fiberglass construction <br />provides a smoother I.D. and can pro- <br />vide a larger I.D. for specified pressures. <br />Thermal Conductivity <br />The thermal conductivity of RED <br />THREAD II pipe is only fraction of that <br />of steel. <br />Low Coefficient of <br />Linear Expansion <br />The coefficient of expansion of RED <br />THREAD II pipe is /s to '/a that of thermo- <br />plastic pipe and only twice that of steel. <br />Adhesives <br />Designed specifically for the RED <br />',THREAD II piping system, the adhe- <br />'`� . 5ives required for joining product and <br />containment piping are Smith Fiber- <br />glass Products DS -7000 series adhesives. <br />Testing of the adhesive systems <br />shows that they are compatible for use <br />belled fittings. For proper tapering, <br />carefully follow the operating instruc- <br />tions (bulletin 9106) included with the <br />tapering tool kit. <br />For detailed installation instructions <br />covering assembly, burial, testing and <br />repair, refer to Smith Fiberglass Products <br />bulletin 1055 for product piping and <br />bulletin 1190 for containment piping - <br />Handling and Storage <br />RED THREAD II pipe is packaged in <br />compact bundles of four to eight <br />lengths. Bundles of RED THREAD II <br />pipe can be safely stored on level ground <br />or on racks with 10 -foot (or less) support <br />spacing. Reasonable care must be used <br />in handling RED THREAD 11 pipe. Do <br />not drop or throw RED THREAD II pipe <br />on the ground or drop rocks or other <br />heavy objects on it. Follow the proper <br />procedures for inspecting piping <br />materials as stated in Smith Fiberglass <br />Products installation bulletin 1055. <br />For industry reference, see API Publication 1615/87 <br />"Installation of Underground Petroleum Storage Sys- <br />iems,"and PEI/RP100-87"Recommended Practices for <br />Installation of Underground Liquid Storage Systems." <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.