My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3 ♦ Containment Crossover Detail <br />2.2.4 Fitting Assembly <br />All containment fittings consist of two halves with flanges <br />as shown in Fig. 2.2.3. The bottom half has threaded in- <br />serts for ease of assembly. <br />Apply adhesive to <br />Pipe must fit snugly <br />into fitting socket so <br />that no gap exists FIGURE 2.2.5 <br />TABLE 2.3.1 Containment Crossover Information <br />These fittings are assembled with adhesive and %-20 wash- <br />er -head bolts that are furnished with the fittings. The re- <br />quired bolts are supplied in small plastic bags. If extra <br />bolts are required, they can be purchased from your dis- <br />tributor. Or, you can use standard %-20 x 1" long hex <br />head bolts. If you use standard bolts, place a flat washer <br />on the bolt before torquing. <br />The bonding surfaces of the containment fittings are sup- <br />plied from the factory pre -sanded. Two-piece secondary <br />containment fittings must be joined using a greater <br />amount of adhesive than is necessary for joining bell and <br />spigot joints of product piping (see Fig. 2.2.5). <br />SECTION 3 • CONTAINMENT CROSSOVER DETAIL <br />2.3.1_ Preparation <br />When ins tti ing a secondary containment system from <br />Smith Fiberglass Products, some preparation is necessary if <br />� e`closest possible separation of lines is required. To <br />minimize the overall change in elevation when installing <br />a containment crossover, it is necessary to shorten one <br />(1) Actual length of the product nipple will vary slightly because of different insertion lengths due to variations in tapers. <br />Remove From <br />Remove From <br />C <br />D <br />Containment <br />45' Crossover <br />Side Run of <br />Product(1) <br />Containment <br />Pipe Size <br />Elbow <br />Tee <br />Nipple Size <br />Nipple Size <br />(in.) (mm) <br />(max. in.) (max. mm) <br />(max. in.) (max. mm) <br />(min. in.) (min. mm) <br />(min. in.) (min, mm) <br />3 75 <br />1.25 32 <br />1.50 38 <br />2 x 8 50 x 200 <br />3 x 6 75 x 150 <br />4 100 <br />2.00 51 <br />1.63 41 <br />3 x 8 75 x 200 <br />4 x 6 100 x 150 <br />6 150 <br />1.25 32 <br />1.00 25 <br />4 x 10 100 x 250 <br />6 x 8 150 x 200 <br />(1) Actual length of the product nipple will vary slightly because of different insertion lengths due to variations in tapers. <br />Containment <br />A <br />B <br />C <br />D <br />E <br />Note:Match drill two holes <br />TABLE 2.3.2 <br />Pipe Separation Distances <br />P P <br />(in.) <br />(5/16, <br />M at a distance of d4" <br />o 0 0 (1199 mm) from the cut end of <br />(in.) <br />3 <br />7.5 <br />10.6 <br />6.5 <br />10 <br />the 45' elbow and the tee. <br />4 <br />8.5 <br />12 <br />7.5 <br />12 <br />16.5 <br />6 <br />10.65 <br />15 <br />8 <br />14.75 <br />22 <br />0 <br />0 <br />qT min o 0 <br />A (100 mm) �64 mm) Cdti 0 <br />i <br />t <br />`E� <br />NOTE: The 2.5" (64 mm) critical dimension must be inspected in the field. <br />FIGURE 2.3.1 <br />Containment <br />A <br />B <br />C <br />D <br />E <br />Pipe (in.) <br />(in.) <br />(in.) <br />(in.) <br />(in.) <br />(in.) <br />3 <br />7.5 <br />10.6 <br />6.5 <br />10 <br />14.5 <br />4 <br />8.5 <br />12 <br />7.5 <br />12 <br />16.5 <br />6 <br />10.65 <br />15 <br />8 <br />14.75 <br />22 <br />Containment <br />A <br />B <br />C <br />D <br />E <br />Pipe (mm) <br />(mm) <br />(mm) <br />(mm) <br />(mm) <br />(mm) <br />I 75 <br />191 <br />269 <br />165 <br />254 <br />368 <br />100 <br />216 <br />305 <br />191 <br />305 <br />419 <br />150 <br />271 <br />381 <br />203 <br />375 <br />559 <br />24 Installation Instructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.