My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: 1624 ARMY CT <br />F. In -Tank Gauging / SIR Equipment <br />Monitoring System Certification <br />Date of Testing/Service: <br />11/03/2006 <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑X Yes <br />❑ No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑X Yes <br />❑ No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑X Yes <br />❑No * <br />Was accuracy of system product level readings tested? <br />ElYes <br />❑No * <br />Was accuracy of system water level readings tested? <br />ZYes <br />❑ No * <br />Were all probes reinstalled properly? <br />0 Yes <br />❑ No <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD) : [E Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑ Yes <br />1:1No' <br />X <br />E] N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h ❑ 0.1 g.p.h ❑0.2 g.p.h <br />ElYes <br />❑ No * <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No * <br />X❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />❑No * <br />❑X N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑No * <br />❑X N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ Yes <br />❑No * <br />❑X N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ Yes <br />❑No * <br />M N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ Yes <br />OZ * <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.