Laserfiche WebLink
11/20/2006 12:44 2094650723 TOYS R US DC 58 PAGE 03/05 <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — PAGE 2 <br />lblurtli- W. <br />�M,OjNITORING OF AREAS DENEATN DIS PENS FR(5)�iS `PERI pt � y THE Q � O 5 " <br />�f1 I. CONTINUOUS FL 1;�ONrC MONITORING OF UNDER DtgPENSER CONTAINMENT (UDC)) (Check all tft apply) Mso. <br />PANEL MANUFACTURER: 1/ r-.UfA4-,r- <br />LEAK SENSOR MANUFACTURER; f/ Mst. MODFL #: y �7 �S—�Sd Msz <br />(� M53. MODEi. <br />WILL ]DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? Msa. y` 20V <br />W1L , A UDC LF,AK ALARM TRIGGER AUTOMATIC PUMP SFIUTDOWN? (�}'a. YES ❑ O 1w,15 - <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEMTRTO ER AUTOMATIC PUMP SHUTDOWN? __ a 7YES q b. NO M56, <br />❑ z, MECHANICAL ASSEMBLY (e.g , FLOAT AND CHAIN ASSEMBLY) IN UDC TRiPS SHEAR VALVE IN CASE OF LEAK � YES ❑ b. NO Ms7. <br />ASSEMBLY MANUFACTURER; r I <br />-- nrsP. MODEL #(S): M79. <br />❑ 3.ViSUAI. MONITORINGBONE: !; a DAILY _ ❑ b. WE1XLY(R <br />❑ 4. NO DISPENSERS y°pt'r0t ) M60. <br />❑ 99, OTHER (SPecify) <br />d <br />I • <br />DETECTION BEEN NOTTFIED BY THE STAtWATER 1-7SOU <br />RESOURCES CONTROL DOATtD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />ON (ELD FOR TTTE UST(S) COV) RED BY TIIIS PLAN. PER 23 CCR ¢2644,1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VA - r AMI ' dc; <br />