My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Boots <br />FlexWorks Test Boots are used to <br />isolate and air -test the interstitial <br />space between the primary and <br />secondary pipe. One test boot is <br />required for each pipe end. <br />Models TBA -3015, Models TBA -0075, -- <br />TBA -3020, TBA -4015 and TBA -4020 TBA -0100, TBA -0150, TBA 07anif TBq¢3�00; <br />FJ_� <br />I 14 L:. <br />Test Gauge Assembly (TGA -15) <br />TCT - 2509 <br />-. --- • �� jai � � 2o�s <br />Test Jumper for AI'lit <br />(TJ -200A) k;-- 5 t <br />Test Line Termination Kit for Air Stems <br />(TLT-36A) <br />�TT T- 2 5 3 �6 <br />Ordering Specifications - -fest Boot & Testing Equipment <br />38 O P VV* 9393 Princeton -Glendale Road s Hamilton, OhioUSA45011 o Phone: (800) 422.2525 • Fax: (800) 421-3297 <br />.s • <br />Weight <br />Model # <br />Application <br />lbs. <br />kg <br />TBA -0075 <br />'/e" Test Boot with Air Stem <br />0.20 <br />0.09 <br />TBA•0100 <br />1 " Test Boot with Air Stem <br />0.20 <br />0.09 <br />TBA -0150 <br />1.5" Test Boot with Air Stem <br />0.35 <br />0.16 <br />TBA -0200 <br />Z" Test Boot with Air Stem <br />0.40 <br />0.18 <br />TBA -0300 <br />3" Test Boot with Air Stem <br />0.70 <br />0.32 <br />TBA -3015 <br />3" to 1.5" Test Boot with Air Stem <br />0.35 <br />0.16 <br />TBA -3020 <br />3to 2" FRP Test soot with Air Stem <br />0.40 <br />1.18 <br />TBA -4015 <br />4" to 1.5" Test Boot with Air Stem <br />0.75 <br />0.34 <br />TBA4020 <br />4" to 2" Test Boot with Air Stem <br />0.75 <br />0.34 <br />TBA -4030 <br />4" to 3" FRP Test Boot with Air Stem <br />0.70 <br />0.32 <br />TJ -200A <br />Test Jumper for Air Stems <br />TLT-36A <br />Test Line Termination Kit for Air Stems <br />TGA -15 <br />Test Gauge Assembly <br />TCT -2509 <br />Test Jumper for Double -Wall Coupling (DPC and SBC Series) <br />M-2536 <br />Test Tube Termination Kit for Double -Wall Coupling (DPC and SBC Series) <br />38 O P VV* 9393 Princeton -Glendale Road s Hamilton, OhioUSA45011 o Phone: (800) 422.2525 • Fax: (800) 421-3297 <br />.s • <br />
The URL can be used to link to this page
Your browser does not support the video tag.